Construction of stairs on the Alatskivi hiking trail (Q3079336): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project will include the construction of one 34,5 m long wooden staircase with a single handrail and a terrace with borders on the top of the cobblestones. For the construction of stairs and terraces, a construction project has been prepared by OÜ Minnol in 2011, which includes the reconstruction of the entire hiking trail. Building a staircase is part of it. In 2012, a pedestrian arc bridge was built on the hiking trail (between lakes) acco...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Construction of stairs on the Alatskivi hiking trail

Revision as of 14:20, 16 August 2021

Project Q3079336 in Estonia
Language Label Description Also known as
English
Construction of stairs on the Alatskivi hiking trail
Project Q3079336 in Estonia

    Statements

    0 references
    20,528.11 Euro
    0 references
    24,150.72 Euro
    0 references
    85.0 percent
    0 references
    1 April 2015
    0 references
    31 October 2015
    0 references
    Alatskivi Vallavalitsus
    0 references
    0 references

    58°36'3.35"N, 27°8'0.28"E
    0 references
    60201
    0 references
    Projekti raames ehitatakse üks 34,5 meetri pikkune ühepoolse käsipuuga puutrepp ja ülemisel osale munakividest terrass koos piiretega. Trepi ja terrassi ehituseks on koostatud 2011.aastal OÜ Minnoli poolt ehitusprojekt, mis hõlmab kogu matkaraja rekonstrueerimist. Trepi ehitamine on üks osa sellest. 2012.aastal ehitati eelpoolnimetatud projekti järgi matkarajale (järvede vahele) jalakäijate kaarsild. Projekti omafinantseering kaasfinantseeritakse KIKi Keskkonnaprogrammist. (Estonian)
    0 references
    The project will include the construction of one 34,5 m long wooden staircase with a single handrail and a terrace with borders on the top of the cobblestones. For the construction of stairs and terraces, a construction project has been prepared by OÜ Minnol in 2011, which includes the reconstruction of the entire hiking trail. Building a staircase is part of it. In 2012, a pedestrian arc bridge was built on the hiking trail (between lakes) according to the above-mentioned project. The self-financing of the project is co-financed by the Environmental Programme of EIC. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.8.01.004.01.15-0010
    0 references