Q3074917 (Q3074917): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes) |
(Created claim: summary (P836): The project is necessary because the property has so far used a collection tank for the collection of municipal waste water. The aim is to build an internal sewerage pipeline and to connect it to an existing connection point., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project is necessary because the property has so far used a collection tank for the collection of municipal waste water. The aim is to build an internal sewerage pipeline and to connect it to an existing connection point. (English) | |||||||||||||||
Property / summary: The project is necessary because the property has so far used a collection tank for the collection of municipal waste water. The aim is to build an internal sewerage pipeline and to connect it to an existing connection point. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is necessary because the property has so far used a collection tank for the collection of municipal waste water. The aim is to build an internal sewerage pipeline and to connect it to an existing connection point. (English) / qualifier | |||||||||||||||
point in time: 16 August 2021
|
Revision as of 13:13, 16 August 2021
Project Q3074917 in Estonia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3074917 in Estonia |
Statements
2,094.00 Euro
0 references
3,173.0 Euro
0 references
65.99 percent
0 references
5 June 2019
0 references
5 December 2019
0 references
Ei kuvata
0 references
74229
0 references
Projekt on vajalik, kuna seni on kinnistul olmereovee kogumiseks kasutatud kogumismahutit. Eesmärk on välja ehitada kinnistusisene kanalisatsioonitorustiku ning ühendada see olemasoleva liitumispunktiga. (Estonian)
0 references
The project is necessary because the property has so far used a collection tank for the collection of municipal waste water. The aim is to build an internal sewerage pipeline and to connect it to an existing connection point. (English)
16 August 2021
0 references
Identifiers
2014-2020.7.01.19-2626
0 references