Q3074709 (Q3074709): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
(‎Created claim: summary (P836): The property has no connection to the public water supply and sewerage system/no proper on-site treatment of waste water. As the house is undergoing repairs and there is currently a dry toilet and well, we want to join the public water supply and sewerage system The aim of the project is to ensure that people have access to drinking water that meets quality requirements and that waste water is properly collected and treated in agglomerations., t...)
Property / summary
 
The property has no connection to the public water supply and sewerage system/no proper on-site treatment of waste water. As the house is undergoing repairs and there is currently a dry toilet and well, we want to join the public water supply and sewerage system The aim of the project is to ensure that people have access to drinking water that meets quality requirements and that waste water is properly collected and treated in agglomerations. (English)
Property / summary: The property has no connection to the public water supply and sewerage system/no proper on-site treatment of waste water. As the house is undergoing repairs and there is currently a dry toilet and well, we want to join the public water supply and sewerage system The aim of the project is to ensure that people have access to drinking water that meets quality requirements and that waste water is properly collected and treated in agglomerations. (English) / rank
 
Normal rank
Property / summary: The property has no connection to the public water supply and sewerage system/no proper on-site treatment of waste water. As the house is undergoing repairs and there is currently a dry toilet and well, we want to join the public water supply and sewerage system The aim of the project is to ensure that people have access to drinking water that meets quality requirements and that waste water is properly collected and treated in agglomerations. (English) / qualifier
 
point in time: 16 August 2021
Timestamp+2021-08-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:10, 16 August 2021

Project Q3074709 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3074709 in Estonia

    Statements

    0 references
    2,718.00 Euro
    0 references
    4,119.0 Euro
    0 references
    65.99 percent
    0 references
    2 May 2019
    0 references
    2 November 2019
    0 references
    Ei kuvata
    0 references
    0 references

    59°19'22.33"N, 25°20'49.56"E
    0 references
    74310
    0 references
    Kinnistul puudub ühendus ühisveevärgiga ja -kanalisatsiooniga/ puudub reovee nõuetekohane kohtkäitlusvõimalus. Kuna majas käib remont ja praegu on kuivkäimla ja kaev, tahame liituda ühisveevärgiga ja -kanalisatsiooniga Projekti eesmärk on tagada inimestele kvaliteedinõuetele vastava joogivee kättesaadavus ja reovee nõuetekohane kokku kogumine ning puhastamine reoveekogumisaladel. (Estonian)
    0 references
    The property has no connection to the public water supply and sewerage system/no proper on-site treatment of waste water. As the house is undergoing repairs and there is currently a dry toilet and well, we want to join the public water supply and sewerage system The aim of the project is to ensure that people have access to drinking water that meets quality requirements and that waste water is properly collected and treated in agglomerations. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.7.01.19-2288
    0 references