Conducting an analysis of the location of wind turbine parks in the framework of the general plan of the municipality of Türi (Q3068264): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
Property / coordinate location
 
58°48'48.74"N, 25°24'31.57"E
Latitude58.813540230469
Longitude25.408770348909
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 58°48'48.74"N, 25°24'31.57"E / rank
 
Normal rank

Revision as of 11:51, 16 August 2021

Project Q3068264 in Estonia
Language Label Description Also known as
English
Conducting an analysis of the location of wind turbine parks in the framework of the general plan of the municipality of Türi
Project Q3068264 in Estonia

    Statements

    0 references
    8,568.00 Euro
    0 references
    10,080.0 Euro
    0 references
    85.0 percent
    0 references
    1 June 2020
    0 references
    31 March 2021
    0 references
    Türi Vallavalitsus
    0 references
    0 references

    58°48'48.74"N, 25°24'31.57"E
    0 references
    72213
    0 references
    Teostatakse analüüs Türi vallas asuvate võimalike tuulikualade kohta, et need Türi valla koostatavasse üldplaneeringusse märkida. Analüüsi käigus teostatakse ruumianalüüs, et valida asukohad, koostatakse 3D visualiseeringud, räägitakse läbi maaomanikega ning tutvustatakse avalikkusele. Nende tegevuste tulemusel kujuneb lõplik valik alade osas, kus on võimalik tuulikuparke rajada ning mis üldplaneeringusse märgitakse. (Estonian)
    0 references
    An analysis of possible wind turbine areas in Türi parish is carried out in order to include them in the comprehensive plan drawn up by the municipality of Türi. In the course of the analysis, a spatial analysis is carried out to select the locations, 3D visualisations are prepared, negotiated with the landowners and presented to the public. These activities will result in a final selection of areas where wind turbine parks can be built and which will be included in the master plan. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.12.01.20-0168
    0 references