Q3067973 (Q3067973): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traff...)
Property / summary
 
The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traffic; the road marking and the road signage system shall be refurbished. (English)
Property / summary: The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traffic; the road marking and the road signage system shall be refurbished. (English) / rank
 
Normal rank
Property / summary: The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traffic; the road marking and the road signage system shall be refurbished. (English) / qualifier
 
point in time: 16 August 2021
Timestamp+2021-08-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:44, 16 August 2021

Project Q3067973 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3067973 in Estonia

    Statements

    0 references
    5,996,223.51 Euro
    0 references
    7,054,380.6 Euro
    0 references
    85.0 percent
    0 references
    1 August 2016
    0 references
    1 January 2018
    0 references
    Transpordiamet
    0 references
    0 references
    10916
    0 references
    Kavandatakse järgmisi LOd parandavad lahendused: rajatakse uus 9 m laiuse kattega tee; ehitatakse välja 3 eritasandilist ristmikku autoliiklusele ning eritasandiline raudteeristmik maantee läbilaskvuse suurendamiseks; korrastatakse samatasandilised ristmikud ja mahasõidud; ehitatakse välja koguja- ja kergliiklusteede võrgustik kogu projekti alal ning jalakäijate tunnel kohaliku ja kergliikluse eraldamiseks transiitliiklusest; korrastatakse teekattemärgistus ja teeviitade süsteem. (Estonian)
    0 references
    The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traffic; the road marking and the road signage system shall be refurbished. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.10.01.16-0031
    0 references