Property / programme | |||
Property / programme: Infrastructure and Environment - PL - ERDF/CF / rank | |||
Normal rank |
Revision as of 22:46, 25 July 2021
Project Q2692979 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the Waste Management Plant Nowy Dwór Sp. z o.o. |
Project Q2692979 in Poland |
Statements
53,272,280.27 zloty
0 references
62,673,270.91 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2022
0 references
ZAKŁAD ZAGOSPODAROWANIA ODPADÓW NOWY DWÓR SP. Z O.O.
0 references
W ramach projektu przewidziano: Zad. 1 Prace przygot. – dok: hala sortowni; przebud. placu, stacja transformat.; ścieżka edu. Zad. 2 Proces sortowania 1.Bud. linii do doczyszcz. odpadów zbier. selektywnie i budową hali w ZZO -zrealizowane 2.Bud. hali sortowni z infrastrukturą (selekt. zbiórka) 3.Technol. linia selekcji z prasą (selekt. zbiórka) -do realizacji 4.Zakup poj. Gminy – wdroż. systemu selekt. zbiórki -do realizacji Zad. 3 Proces kompostowania. 1.Bud. inst. Biolog. przetw. odpad. w system. zamkniętych bioreaktorów żelbet. z usprawnien odbioru frakcji podsitowej z sortowni -zrealizowane. 2.Przebud. i rozbud. istniejącego placu na odpady bud. na plac o pow. 3600 m2 na bioodpady i polepszacz glebowy na dz.217/6 -do realizacji Zad. 4 Proces odzysku 1.Technologia RDF-u -do realizacji 2.Bud. zadasz. placu na odpady bud. o pw. 5500m2 z panel fotowolt. -do realizacji Zad. 5 PSZOK 1.Rozbud. istniej.PSZOK na terenie ZZO z infrastr: hala magaz.na odpady surowcowe z panelami PV. na dachu i zbiornik ppoż. -do realizacji Zad. 6 Infrastruk. towarzysz. 1.Bud. sieci sanit. i elektr. zwiąż. z bud. linii doczyszcz. odpad. odbieranych selekt. i bud. inst. biolog. przetwarz. odpadów i Kolektor zrzutowy ze zbior.wód deszcz. na terenie ZZO –zrealizowane 2.Bud. stacji transfor. o mocy 800 kW (ST4) - do realizacji 3.Bud. przyłącza kabl. średn. napięcia z linii SN-15 kV Sępólno ze złącz. kablowym (do realizacji) 4.Bud. stacji transfor. o mocy 800 kW (ST2) z projekt. złącza kablow. i zmiana sposobu zasilania istn. stacji ST1 - do realizacji 5.Bud. parkingu i bud. kontroli -do realizacji Zad. 7 Dostawa maszyn 1.Przesiewacz i Ładowarka -zrealizowane 2.Prasa kanał. z perforatorem i przenośnik. załadowczym -zrealizowane 3. Rozdrabniacz mobilny z zest. wałów rozdrabniających, ładowarka średnia, ładowarka duża, 2x wózek widłowy, sam. hakowy z norma DIN do odbioru z PSZOK -do realizacji 4.Dostawa maszyn mobiln.do obsługi placu na bio odpady (separator na szkło (Polish)
0 references
The project foresees: AWW. 1 Preparation work. — doc: sorting hall; reconstruction of the square, transforming station.; the edu path. AWW. 2 Sorting process 1.Building a waste treatment line collects selectively and constructing a hall in ZZO – realised 2.Building a sort hall with infrastructure (collection electrification) 3.Technol. selection line with press (collection selector) – to implement 4.Purchasing capacity. Municipalities – implementation of the collection system – to be implemented 3 Composting process. 1.Bud. inst. Biolog. waste in closed reinforced concrete bioreactors system. with improved collection of subset fraction from sorting plant – realised. 2.Reconstruction and extension of the existing site for waste construction into a square with an area 3600 m² for bio-waste and soil improver on dz.217/6 – to be implemented 4 Recovery process 1.RDF technology – for the implementation of 2.Bud. roof. waste yard building 5500 m² of photovolt panel. to be implemented 5 PSZOK 1.Expansion. existing.PSZOK in ZZO area with infrastr: storage hall for raw material waste with PV panels on the roof and firebow tank. to be implemented 6 Infrastructure. comrade. 1.Construction of the sanitary and electr. networks with the construction of the waste purification line. the waste received and the construction of the biologist’s inst. waste processing and the discharge collector from the collection of rain water. on the ZZO area – completed 2.Construction of a transfor. station with a power of 800 kW (ST4) – for the realisation of 3.Construction of cable. medium voltage from the SN-15 kV line Soplno with cable connectors (to be implemented) 4.Bud. transfor. 800 kW (ST2) stations with the design. cable connectors. and change of the power supply method of the ST1 station – to the realisation of 5.Build. parking lot and the building of control – to implement the Zad. 7 Machine Delivery 1.Screen and Loader – realised 2.Press channel. with perforator and conveyor. loading – realised 3. Mobile shredder with crushing shafts, medium loader, large loader, 2x forklift, same. DIN hook for pickup from PSZOK – to realise 4.Supply of mobile machines. for handling the bio-waste square (glass separator) (English)
7 July 2021
0 references
Identifiers
POIS.02.02.00-00-0032/18
0 references