Energy saving measures (Q3060456): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): Prozessoptimierung Trocknung, Betr. Energiesparmaßnahmen, Krems an der Donau)
Property / summary
 
Prozessoptimierung Trocknung, Betr. Energiesparmaßnahmen, Krems an der Donau (Austrian German)
Property / summary: Prozessoptimierung Trocknung, Betr. Energiesparmaßnahmen, Krems an der Donau (Austrian German) / rank
 
Normal rank

Revision as of 11:38, 20 July 2021

Project in Austria 172
Language Label Description Also known as
English
Energy saving measures
Project in Austria 172

    Statements

    0 references
    125,214.0 Euro
    0 references
    3 April 2017
    0 references
    31 March 2018
    0 references
    REGINA Textilreinigungs GmbH
    0 references

    48°24'35.32"N, 15°36'22.75"E
    0 references
    30101
    0 references
    Prozessoptimierung Trocknung, Betr. Energiesparmaßnahmen, Krems an der Donau (German)
    0 references
    Process optimisation drying, energy saving measures, Krems on the Danube (English)
    20 July 2021
    0 references
    Prozessoptimierung Trocknung, Betr. Energiesparmaßnahmen, Krems an der Donau (Austrian German)
    0 references
    Krems an der Donau
    0 references

    Identifiers

    AUST-172
    0 references