Construction of a new operating building (Q3060950): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Steyr-Kirchdorf / rank
 
Normal rank

Revision as of 11:17, 20 July 2021

Project in Austria 662
Language Label Description Also known as
English
Construction of a new operating building
Project in Austria 662

    Statements

    0 references
    1,315,100.0 Euro
    0 references
    19 November 2019
    0 references
    30 June 2022
    0 references
    my-PV GmbH;Solar Electric Buildings GmbH
    0 references

    48°2'40.99"N, 14°18'33.12"E
    0 references
    41516
    0 references
    Errichtung eines neuen Betriebsgebäudes durch die Solar Electric Buidlings GmbH. Es handelt sich um eine Stahlhalle mit Holzverbau. Die Fertigungsfläche wird dadurch verdreifacht. (German)
    0 references
    Construction of a new operating building by Solar Electric Buidlings GmbH. It is a steel hall with wooden construction. The production area is tripled as a result. (English)
    20 July 2021
    0 references
    Sierning
    0 references

    Identifiers

    AUST-662
    0 references