Q3060984 (Q3060984): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: trying to import one item from austria) |
(Created claim: summary (P836): For an improved processing of the hydropower business area with the product “through-flow turbine”, the company plans to build a production hall building and to equip it with the machine., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
For an improved processing of the hydropower business area with the product “through-flow turbine”, the company plans to build a production hall building and to equip it with the machine. (English) | |||||||||||||||
Property / summary: For an improved processing of the hydropower business area with the product “through-flow turbine”, the company plans to build a production hall building and to equip it with the machine. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: For an improved processing of the hydropower business area with the product “through-flow turbine”, the company plans to build a production hall building and to equip it with the machine. (English) / qualifier | |||||||||||||||
point in time: 20 July 2021
|
Revision as of 07:46, 20 July 2021
Project in Austria 696
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Austria 696 |
Statements
879,352.22 Euro
0 references
2 February 2017
0 references
30 September 2019
0 references
Mayrhofer Gesellschaft m.b.H.
0 references
62262
0 references
Für eine verbesserte Bearbeitung des Geschäftsfeldes "Wasserkraft" mit dem Produkt "Durchströmturbine" plant das Unternehmen die Errichtung eines Produktionshallenzubaus und die maschinelle Ausstattung desselben. (German)
0 references
For an improved processing of the hydropower business area with the product “through-flow turbine”, the company plans to build a production hall building and to equip it with the machine. (English)
20 July 2021
0 references
Identifiers
AUST-696
0 references