Q3060596 (Q3060596): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: trying to import one item from austria)
(‎Created claim: summary (P836): Plant optimisation Wood drying systems, energy saving measures, Red Tower at Pinka, translated_summary)
Property / summary
 
Plant optimisation Wood drying systems, energy saving measures, Red Tower at Pinka (English)
Property / summary: Plant optimisation Wood drying systems, energy saving measures, Red Tower at Pinka (English) / rank
 
Normal rank
Property / summary: Plant optimisation Wood drying systems, energy saving measures, Red Tower at Pinka (English) / qualifier
 
point in time: 20 July 2021
Timestamp+2021-07-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 07:44, 20 July 2021

Project in Austria 312
Language Label Description Also known as
English
No label defined
Project in Austria 312

    Statements

    0 references
    80,600.0 Euro
    0 references
    28 May 2018
    0 references
    30 November 2019
    0 references
    Hans J. Fischer GmbH
    0 references
    10921
    0 references
    Anlagenoptimierung Holztrocknungsanlagen, Betr. Energiesparmaßnahmen, Rotenturm an der Pinka (German)
    0 references
    Plant optimisation Wood drying systems, energy saving measures, Red Tower at Pinka (English)
    20 July 2021
    0 references

    Identifiers

    AUST-312
    0 references