Reconstruction of the main state motorway A9 Riga (Skulte) – Liepaja, km 24.40-38.18 duvet (bridge) (Q3057608): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The aim of the project is to rebuild the duvet and bridge (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 29 months. Estimated total cost of the project EUR 17544860. As a result of the project, the main...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Reconstruction of the main state motorway A9 Riga (Skulte) – Liepaja, km 24.40-38.18 duvet (bridge) |
Revision as of 12:47, 15 July 2021
Project Q3057608 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the main state motorway A9 Riga (Skulte) – Liepaja, km 24.40-38.18 duvet (bridge) |
Project Q3057608 in Latvia |
Statements
12,302,332.18 Euro
0 references
14,473,331.97 Euro
0 references
17 September 2015
0 references
16 February 2018
0 references
Satiksmes ministrija
0 references
Projekta mērķis ir veikt segas un tilta pārbūvi (paaugstinot segas nestspēju), kas ietver jauna asfaltbetona seguma izbūvi, būvuzraudzību, autoruzraudzību, kā rezultātā tiks nodrošināti autoceļu lietotājiem komfortabli un droši braukšanas apstākļi. Plānotais kopējais projekta īstenošanas ilgums 29 mēneši. Projekta plānotās kopējās izmaksas 17 544 860 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts galvenā autoceļa A9 Rīga (Skulte) – Liepāja posms ar tiltu pār Lielupi 13,68 km garumā. Projektā ietvertā autoceļa posma maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. (Latvian)
0 references
The aim of the project is to rebuild the duvet and bridge (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 29 months. Estimated total cost of the project EUR 17544860. As a result of the project, the main state motorway A9 Riga (Skulte) – Liepāja section with bridge over Lielupe 13,68 km will be arranged. The maximum driving axle load on the road section covered by the project will be 11.5 tonnes and the maximum uncontrolled vehicle mass will be 44 tonnes. (English)
15 July 2021
0 references
Kalnciema pag., Jelgavas nov.
0 references
Valgundes pag., Jelgavas nov.
0 references
Jaunbērzes pag., Dobeles nov.
0 references
Identifiers
6.1.5.0/15/I/002
0 references