Q3057258 (Q3057258): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): The aim of the project is to increase the energy efficiency of the boiler house of PSIA “NORMA K” by reducing fuel consumption for thermal energy production, by purchasing and installing more efficient technological equipment within the 2 rd stage of the boiler house. The applicant for the project is PSIA “NORMA K”, a company with NACE 2: 35.30. Steam delivery and air conditioning. The merchant provides thermal energy production and delivery in...)
Property / summary
 
The aim of the project is to increase the energy efficiency of the boiler house of PSIA “NORMA K” by reducing fuel consumption for thermal energy production, by purchasing and installing more efficient technological equipment within the 2 rd stage of the boiler house. The applicant for the project is PSIA “NORMA K”, a company with NACE 2: 35.30. Steam delivery and air conditioning. The merchant provides thermal energy production and delivery in Mālpils. Main project activities: — preparation of technical design documentation; Reconstruction of the source of district heating production – boiler house. Planned project results: — 1 feasibility studies developed; The purchase, purchase and installation of a new 3,0 MW boiler system; Project total costs EUR 956367,00, of which Project eligible costs EUR 589700,00, total Cohesion Fund support 40,00 % of the eligible costs of the project: EUR 235880,00. Total ineligible costs of the project is EUR 366667,00.Project supporting documentation – feasibility study was developed before submitting the Project to the CFLA, but its preparation costs are eligible according to 07.03.2017. Regulation No.135 "Regulations of the first round of project applications of the operational programme "Growth and Employment" Specific Objective 4.3.1 "Promoting energy efficiency and the use of local RES in district heating" (hereinafter – "Regulations of the Cabinet of Ministers") – Paragraphs 23.1 and 29. The planned duration of the project is 25 months after the conclusion of the contract with CFLA – i.e. until May-June 2020. The implementation of the project will provide the following output indicators: — Modernisation and increase of thermal generation capacity using renewable energy sources in district heating: 3,0 MW. (English)
Property / summary: The aim of the project is to increase the energy efficiency of the boiler house of PSIA “NORMA K” by reducing fuel consumption for thermal energy production, by purchasing and installing more efficient technological equipment within the 2 rd stage of the boiler house. The applicant for the project is PSIA “NORMA K”, a company with NACE 2: 35.30. Steam delivery and air conditioning. The merchant provides thermal energy production and delivery in Mālpils. Main project activities: — preparation of technical design documentation; Reconstruction of the source of district heating production – boiler house. Planned project results: — 1 feasibility studies developed; The purchase, purchase and installation of a new 3,0 MW boiler system; Project total costs EUR 956367,00, of which Project eligible costs EUR 589700,00, total Cohesion Fund support 40,00 % of the eligible costs of the project: EUR 235880,00. Total ineligible costs of the project is EUR 366667,00.Project supporting documentation – feasibility study was developed before submitting the Project to the CFLA, but its preparation costs are eligible according to 07.03.2017. Regulation No.135 "Regulations of the first round of project applications of the operational programme "Growth and Employment" Specific Objective 4.3.1 "Promoting energy efficiency and the use of local RES in district heating" (hereinafter – "Regulations of the Cabinet of Ministers") – Paragraphs 23.1 and 29. The planned duration of the project is 25 months after the conclusion of the contract with CFLA – i.e. until May-June 2020. The implementation of the project will provide the following output indicators: — Modernisation and increase of thermal generation capacity using renewable energy sources in district heating: 3,0 MW. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to increase the energy efficiency of the boiler house of PSIA “NORMA K” by reducing fuel consumption for thermal energy production, by purchasing and installing more efficient technological equipment within the 2 rd stage of the boiler house. The applicant for the project is PSIA “NORMA K”, a company with NACE 2: 35.30. Steam delivery and air conditioning. The merchant provides thermal energy production and delivery in Mālpils. Main project activities: — preparation of technical design documentation; Reconstruction of the source of district heating production – boiler house. Planned project results: — 1 feasibility studies developed; The purchase, purchase and installation of a new 3,0 MW boiler system; Project total costs EUR 956367,00, of which Project eligible costs EUR 589700,00, total Cohesion Fund support 40,00 % of the eligible costs of the project: EUR 235880,00. Total ineligible costs of the project is EUR 366667,00.Project supporting documentation – feasibility study was developed before submitting the Project to the CFLA, but its preparation costs are eligible according to 07.03.2017. Regulation No.135 "Regulations of the first round of project applications of the operational programme "Growth and Employment" Specific Objective 4.3.1 "Promoting energy efficiency and the use of local RES in district heating" (hereinafter – "Regulations of the Cabinet of Ministers") – Paragraphs 23.1 and 29. The planned duration of the project is 25 months after the conclusion of the contract with CFLA – i.e. until May-June 2020. The implementation of the project will provide the following output indicators: — Modernisation and increase of thermal generation capacity using renewable energy sources in district heating: 3,0 MW. (English) / qualifier
 
point in time: 15 July 2021
Timestamp+2021-07-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:43, 15 July 2021

Project Q3057258 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057258 in Latvia

    Statements

    0 references
    235,880.0 Euro
    0 references
    589,700.0 Euro
    0 references
    7 May 2018
    0 references
    1 June 2020
    0 references
    Pašvaldības sabiedrība ar ierobežotu atbildību "NORMA K"
    0 references
    0 references
    0 references

    57°0'34.31"N, 24°57'32.00"E
    0 references
    Projekta mērķis ir PSIA “NORMA K” katlu mājas energoefektivitātes paaugstināšana, samazinot kurināmā patēriņu siltumenerģijas ražošanai, katlu mājas 2. rekonstrukcijas kārtas ietvaros iegādājoties un uzstādot efektīvākas tehnoloģiskās iekārtas. Projekta iesniedzējs ir PSIA “NORMA K” – uzņēmums, kura viens no darbības veidiem ir NACE 2: 35.30. “Tvaika piegāde un gaisa kondicionēšana”. Komersants siltumenerģijas ražošanu un piegādi sniedz Mālpilī. Galvenās projekta darbības: - projekta tehniskās dokumentācijas sagatavošana; - centralizētās siltumapgādes ražošanas avota - katlu mājas rekonstrukcija. Plānotie projekta rezultāti: - izstrādāts 1 tehniski ekonomiskais pamatojums; - jauna 3,0 MW jaudas katla sistēmas, iegāde un uzstādīšana; Projekta kopējās izmaksas 956 367,00 EUR, no kurām Projekta attiecināmās izmaksas 589 700,00 EUR, kopējais Kohēzijas fonda atbalsts 40,00% no Projekta attiecināmajām izmaksām: 235 880,00 EUR. Projekta kopējās neattiecināmās izmaksas ir 366 667,00 Euro.Projekta pamatojošā dokumentācija – tehniski ekonomiskais pamatojums ir izstrādāts pirms Projekta iesniegšanas CFLA, bet tā sagatavošanas izmaksas ir attiecināmas saskaņā ar 07.03.2017. MK noteikumu Nr.135 “Darbības programmas "Izaugsme un nodarbinātība" 4.3.1. specifiskā atbalsta mērķa "Veicināt energoefektivitāti un vietējo AER izmantošanu centralizētajā siltumapgādē" pirmās projektu iesniegumu atlases kārtas īstenošanas noteikumi” (turpmāk – “MK noteikumi Nr.135”) 23.1. un 29.punktu. Projekta plānotais ilgums ir 25 mēneši pēc līguma ar CFLA noslēgšanu – t.i. līdz 2020.gada maijam- jūnijam. Projekta īstenošana nodrošinās šādus iznākumu rādītājus: - atjaunojamo energoresursu izmantojošu siltumražošanas jaudu modernizācija un pieaugums centralizētajā siltumapgādē: 3,0 MW. (Latvian)
    0 references
    The aim of the project is to increase the energy efficiency of the boiler house of PSIA “NORMA K” by reducing fuel consumption for thermal energy production, by purchasing and installing more efficient technological equipment within the 2 rd stage of the boiler house. The applicant for the project is PSIA “NORMA K”, a company with NACE 2: 35.30. Steam delivery and air conditioning. The merchant provides thermal energy production and delivery in Mālpils. Main project activities: — preparation of technical design documentation; Reconstruction of the source of district heating production – boiler house. Planned project results: — 1 feasibility studies developed; The purchase, purchase and installation of a new 3,0 MW boiler system; Project total costs EUR 956367,00, of which Project eligible costs EUR 589700,00, total Cohesion Fund support 40,00 % of the eligible costs of the project: EUR 235880,00. Total ineligible costs of the project is EUR 366667,00.Project supporting documentation – feasibility study was developed before submitting the Project to the CFLA, but its preparation costs are eligible according to 07.03.2017. Regulation No.135 "Regulations of the first round of project applications of the operational programme "Growth and Employment" Specific Objective 4.3.1 "Promoting energy efficiency and the use of local RES in district heating" (hereinafter – "Regulations of the Cabinet of Ministers") – Paragraphs 23.1 and 29. The planned duration of the project is 25 months after the conclusion of the contract with CFLA – i.e. until May-June 2020. The implementation of the project will provide the following output indicators: — Modernisation and increase of thermal generation capacity using renewable energy sources in district heating: 3,0 MW. (English)
    15 July 2021
    0 references
    Enerģētikas iela 3, Mālpils, Mālpils pag., Siguldas nov., LV-2152
    0 references

    Identifiers

    4.3.1.0/17/A/016
    0 references