(‎Created claim: summary (P836): The aim of the project is to reduce heat loss in transmission and distribution systems, prevent heat transmission leakages into the heating networks, reduce operating and maintenance costs, as well as improve the hydraulic performance of the heating system by replacing emergency pipelines in reinforced concrete channels with industrially insulated non-canal heat mains. When implementing the reconstruction project, it is planned to optimise the t...)
Property / summary
 
The aim of the project is to reduce heat loss in transmission and distribution systems, prevent heat transmission leakages into the heating networks, reduce operating and maintenance costs, as well as improve the hydraulic performance of the heating system by replacing emergency pipelines in reinforced concrete channels with industrially insulated non-canal heat mains. When implementing the reconstruction project, it is planned to optimise the tracks, reduce the diameters of the existing pipes, thus saving heat energy. The project envisages the construction of a new connecting heat main, connecting two stages, as a result of which the heat supply for buildings will be restored: Source street 2. 4. 8. 8a. 10 and Upes Street 2. As a result of the project fuel consumption from the existing 3003 MWh season will be reduced to 2750 MWh per season, as well as electricity consumption from the existing 27,19 MWh season will be reduced to 23.66 MWh.The project is expected to be implemented within 22 months from the date of conclusion of the contract with CFLA for attracting co-funding of the KF. Its total cost could amount to around EUR 336 737, of which the CF co-funding some EUR 111 318. (English)
Property / summary: The aim of the project is to reduce heat loss in transmission and distribution systems, prevent heat transmission leakages into the heating networks, reduce operating and maintenance costs, as well as improve the hydraulic performance of the heating system by replacing emergency pipelines in reinforced concrete channels with industrially insulated non-canal heat mains. When implementing the reconstruction project, it is planned to optimise the tracks, reduce the diameters of the existing pipes, thus saving heat energy. The project envisages the construction of a new connecting heat main, connecting two stages, as a result of which the heat supply for buildings will be restored: Source street 2. 4. 8. 8a. 10 and Upes Street 2. As a result of the project fuel consumption from the existing 3003 MWh season will be reduced to 2750 MWh per season, as well as electricity consumption from the existing 27,19 MWh season will be reduced to 23.66 MWh.The project is expected to be implemented within 22 months from the date of conclusion of the contract with CFLA for attracting co-funding of the KF. Its total cost could amount to around EUR 336 737, of which the CF co-funding some EUR 111 318. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to reduce heat loss in transmission and distribution systems, prevent heat transmission leakages into the heating networks, reduce operating and maintenance costs, as well as improve the hydraulic performance of the heating system by replacing emergency pipelines in reinforced concrete channels with industrially insulated non-canal heat mains. When implementing the reconstruction project, it is planned to optimise the tracks, reduce the diameters of the existing pipes, thus saving heat energy. The project envisages the construction of a new connecting heat main, connecting two stages, as a result of which the heat supply for buildings will be restored: Source street 2. 4. 8. 8a. 10 and Upes Street 2. As a result of the project fuel consumption from the existing 3003 MWh season will be reduced to 2750 MWh per season, as well as electricity consumption from the existing 27,19 MWh season will be reduced to 23.66 MWh.The project is expected to be implemented within 22 months from the date of conclusion of the contract with CFLA for attracting co-funding of the KF. Its total cost could amount to around EUR 336 737, of which the CF co-funding some EUR 111 318. (English) / qualifier
 
point in time: 15 July 2021
Timestamp+2021-07-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:43, 15 July 2021

Project Q3057214 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057214 in Latvia

    Statements

    0 references
    0 references
    83,935.14 Euro
    0 references
    209,837.87 Euro
    0 references
    10 May 2018
    0 references
    9 March 2020
    0 references
    SIA "AIZPUTES KOMUNĀLAIS UZŅĒMUMS"
    0 references
    0 references
    0 references

    56°43'21.47"N, 21°36'24.26"E
    0 references
    Projekta mērķis ir samazināt siltumenerģijas zudumus pārvades un sadales sistēmās, novērst siltumnesēja noplūdes siltumtīklos, samazināt ekspluatācijas un uzturēšanas izmaksas, kā arī uzlabot siltumapgādes sistēmas hidrauliskos rādītājus, nomainot avārijas stāvoklī esošos cauruļvadus dzelzsbetona kanālos ar rūpnieciski izolētām bezkanāla siltumtrasēm.Projektā paredzēta esošās siltumtrases cauruļu, kas izvietotas dzelzsbetona kanālos 600 metru garumā nomaiņa ar rūpnieciski izolētām bezkanāla siltumtrasēm. Realizējot rekonstrukcijas projektu, plānots veikt trašu optimizāciju, samazināt esošo cauruļu diametrus, tā ietaupot siltumenerģiju. Projektā paredzēts jaunas savienojošās siltumtrases izbūve, savienojot divus posmus, kā rezultātā tiks atjaunota siltumapgāde ēkām: Avotu iela 2. 4. 8. 8a. 10 un Upes iela 2. 4, Aizputē, Aizputes novadā.Projekta rezultātā tiks samazināts kurināmā patēriņš no esošiem 3003 MWh sezonā līdz 2750 MWh sezonā, ka arī būtiski samazināts elektroenerģijas patēriņš no esošiem 27,19 MWh sezonā līdz 23,66 MWh.Paredzams, ka projekts tiks īstenots 22 mēnešu laikā no līguma ar CFLA noslēgšanas brīža par KF līdzfinansējuma piesaisti. Tā kopējās izmaksas varētu sasniegt ap EUR 336 737, no kā aptuveni EUR 111 318 sastādīt KF līdzfinansējums. (Latvian)
    0 references
    The aim of the project is to reduce heat loss in transmission and distribution systems, prevent heat transmission leakages into the heating networks, reduce operating and maintenance costs, as well as improve the hydraulic performance of the heating system by replacing emergency pipelines in reinforced concrete channels with industrially insulated non-canal heat mains. When implementing the reconstruction project, it is planned to optimise the tracks, reduce the diameters of the existing pipes, thus saving heat energy. The project envisages the construction of a new connecting heat main, connecting two stages, as a result of which the heat supply for buildings will be restored: Source street 2. 4. 8. 8a. 10 and Upes Street 2. As a result of the project fuel consumption from the existing 3003 MWh season will be reduced to 2750 MWh per season, as well as electricity consumption from the existing 27,19 MWh season will be reduced to 23.66 MWh.The project is expected to be implemented within 22 months from the date of conclusion of the contract with CFLA for attracting co-funding of the KF. Its total cost could amount to around EUR 336 737, of which the CF co-funding some EUR 111 318. (English)
    15 July 2021
    0 references
    Aizpute, Dienvidkurzemes nov.
    0 references

    Identifiers

    4.3.1.0/17/A/082