(‎Created claim: summary (P836): The direct aim of the project “Installation of the solar collector system for improving the energy efficiency of the Krāslava swimming pool” is to install a solar collector system for the Krāslava swimming pool building, reducing thermal energy consumption and promoting the energy efficiency of the building. Within the framework of the project, the following activities are planned: To install a solar collector system with a total capacity of 100...)
Property / summary
 
The direct aim of the project “Installation of the solar collector system for improving the energy efficiency of the Krāslava swimming pool” is to install a solar collector system for the Krāslava swimming pool building, reducing thermal energy consumption and promoting the energy efficiency of the building. Within the framework of the project, the following activities are planned: To install a solar collector system with a total capacity of 100.856 kW to prepare the hot water for the needs of the pool; – to install a solar modular system with a total capacity of 52 kW for electricity production from removable energy resources;- installation of an automatic control system.The project will result in a reduction of primary energy consumption by 266230 kWh per year, while the reduction of carbon dioxide emissions is planned at 45.012 tCo2 per year. The project is planned to be implemented within 9 months.The planned total cost of the project is EUR 198 407.10, the eligible costs of the project are estimated at EUR 161 807.54 incl. European Regional Development Fund funding EUR 137 536.41 (85.00 %), project ineligible costs amount to EUR 36 599.56 (English)
Property / summary: The direct aim of the project “Installation of the solar collector system for improving the energy efficiency of the Krāslava swimming pool” is to install a solar collector system for the Krāslava swimming pool building, reducing thermal energy consumption and promoting the energy efficiency of the building. Within the framework of the project, the following activities are planned: To install a solar collector system with a total capacity of 100.856 kW to prepare the hot water for the needs of the pool; – to install a solar modular system with a total capacity of 52 kW for electricity production from removable energy resources;- installation of an automatic control system.The project will result in a reduction of primary energy consumption by 266230 kWh per year, while the reduction of carbon dioxide emissions is planned at 45.012 tCo2 per year. The project is planned to be implemented within 9 months.The planned total cost of the project is EUR 198 407.10, the eligible costs of the project are estimated at EUR 161 807.54 incl. European Regional Development Fund funding EUR 137 536.41 (85.00 %), project ineligible costs amount to EUR 36 599.56 (English) / rank
 
Normal rank
Property / summary: The direct aim of the project “Installation of the solar collector system for improving the energy efficiency of the Krāslava swimming pool” is to install a solar collector system for the Krāslava swimming pool building, reducing thermal energy consumption and promoting the energy efficiency of the building. Within the framework of the project, the following activities are planned: To install a solar collector system with a total capacity of 100.856 kW to prepare the hot water for the needs of the pool; – to install a solar modular system with a total capacity of 52 kW for electricity production from removable energy resources;- installation of an automatic control system.The project will result in a reduction of primary energy consumption by 266230 kWh per year, while the reduction of carbon dioxide emissions is planned at 45.012 tCo2 per year. The project is planned to be implemented within 9 months.The planned total cost of the project is EUR 198 407.10, the eligible costs of the project are estimated at EUR 161 807.54 incl. European Regional Development Fund funding EUR 137 536.41 (85.00 %), project ineligible costs amount to EUR 36 599.56 (English) / qualifier
 
point in time: 15 July 2021
Timestamp+2021-07-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:42, 15 July 2021

Project Q3057187 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057187 in Latvia

    Statements

    0 references
    0 references
    137,536.41 Euro
    0 references
    161,807.54 Euro
    0 references
    10 February 2021
    0 references
    9 November 2021
    0 references
    Krāslavas novada pašvaldība
    0 references
    0 references

    55°54'3.20"N, 27°10'12.50"E
    0 references
    Projekta "Saules kolektoru sistēmas uzstādīšana Krāslavas peldbaseina energoefektivitātes uzlabošanai" tiešais mērķis ir uzstādīt saules kolektoru sistēmu Krāslavas peldbaseina ēkai, samazinot siltumenerģijas patēriņu un veicinot ēkas energoefektivitātes paaugstināšanu. Projektā ietvaros ir plānotas šādas darbības: - ierīkot saules kolektoru sistēmu ar kopējo jaudu 100,856 kW kārstā ūdens sagatavošanai baseina vajadzībām;- ierīkot saules moduļu sistēmu ar kopējo jaudu 52 kW elektrības ražošanai no atjaujamiem energoresursiem;- automātiskās vadības sistēmas ierīkošana.Projekta rezultātā tiks samazināts primārās enerģijas patēriņš par 266 230 kWh gadā, bet oglekļa dioksīda emisijas samazinājums ir plānots 45,012 tCo2 gadā.Projekta uzsākšana ir plānota 2021.gada 1.ceruksnī. Projektu plānots īstenot 9 mēnešu laikā.Projekta plānotās kopējās izmaksas sastāda EUR 198 407.10, projekta attiecināmās izmaksas plānotās EUR 161 807.54 apmērā t.sk. Eiropas Reģionālās attīstības fonda finansējums EUR 137 536.41 (85.00%), projekta neattiecināmās izmaksas sastāda EUR 36 599.56 (Latvian)
    0 references
    The direct aim of the project “Installation of the solar collector system for improving the energy efficiency of the Krāslava swimming pool” is to install a solar collector system for the Krāslava swimming pool building, reducing thermal energy consumption and promoting the energy efficiency of the building. Within the framework of the project, the following activities are planned: To install a solar collector system with a total capacity of 100.856 kW to prepare the hot water for the needs of the pool; – to install a solar modular system with a total capacity of 52 kW for electricity production from removable energy resources;- installation of an automatic control system.The project will result in a reduction of primary energy consumption by 266230 kWh per year, while the reduction of carbon dioxide emissions is planned at 45.012 tCo2 per year. The project is planned to be implemented within 9 months.The planned total cost of the project is EUR 198 407.10, the eligible costs of the project are estimated at EUR 161 807.54 incl. European Regional Development Fund funding EUR 137 536.41 (85.00 %), project ineligible costs amount to EUR 36 599.56 (English)
    15 July 2021
    0 references
    Raiņa iela 25, Krāslava, Krāslavas nov., LV-5601
    0 references

    Identifiers

    4.2.2.0/20/I/008
    0 references