(‎Created claim: summary (P836): In the project investments are planned to rebuild the old sports house building of Saldus Sports School owned by Saldus Municipality into a sports hall. A low-energy building with an annual energy consumption for heating of not more than 50 kWh/m² and a total energy consumption of not more than 120 kWh/m² is planned. 1. Improvement of the external envelopes of the building, including insulation of facade, roof, foundations and floor, replacement...)
Property / summary
 
In the project investments are planned to rebuild the old sports house building of Saldus Sports School owned by Saldus Municipality into a sports hall. A low-energy building with an annual energy consumption for heating of not more than 50 kWh/m² and a total energy consumption of not more than 120 kWh/m² is planned. 1. Improvement of the external envelopes of the building, including insulation of facade, roof, foundations and floor, replacement of doors and windows;2. Improvement of technical systems (reconstruction and modernisation of heating, ventilation and lighting systems);3. Purchase and installation of solar collectors with a total system power of 14.624 kW for the production of heat required by hot water;4. The aim of the project is to reduce the consumption of primary energy in the Saldus sports house as a result of measures that promote energy efficiency, in accordance with the priorities of Saldus municipality development programme.Planned indicators after implementation of the project (in 2020):1) Reduction of annual consumption of primary energy in Saldus sports house, 2) Reduction of annual energy consumption of 227851 kWh/year, 2) Additional capacity produced by the AER equipment 0.015 MWh per year, 3) Greenhouse gas reduction 46.648 CO2 tons per year.The project is planned to be implemented within 27 months from the project’s total costs, the total costs of the project – EUR 54 39, EUR 2263989 % reduction of greenhouse gases 46.648 CO2 tons per year.The project is to be implemented within 27 months from the agreement on the implementation of the project. (English)
Property / summary: In the project investments are planned to rebuild the old sports house building of Saldus Sports School owned by Saldus Municipality into a sports hall. A low-energy building with an annual energy consumption for heating of not more than 50 kWh/m² and a total energy consumption of not more than 120 kWh/m² is planned. 1. Improvement of the external envelopes of the building, including insulation of facade, roof, foundations and floor, replacement of doors and windows;2. Improvement of technical systems (reconstruction and modernisation of heating, ventilation and lighting systems);3. Purchase and installation of solar collectors with a total system power of 14.624 kW for the production of heat required by hot water;4. The aim of the project is to reduce the consumption of primary energy in the Saldus sports house as a result of measures that promote energy efficiency, in accordance with the priorities of Saldus municipality development programme.Planned indicators after implementation of the project (in 2020):1) Reduction of annual consumption of primary energy in Saldus sports house, 2) Reduction of annual energy consumption of 227851 kWh/year, 2) Additional capacity produced by the AER equipment 0.015 MWh per year, 3) Greenhouse gas reduction 46.648 CO2 tons per year.The project is planned to be implemented within 27 months from the project’s total costs, the total costs of the project – EUR 54 39, EUR 2263989 % reduction of greenhouse gases 46.648 CO2 tons per year.The project is to be implemented within 27 months from the agreement on the implementation of the project. (English) / rank
 
Normal rank
Property / summary: In the project investments are planned to rebuild the old sports house building of Saldus Sports School owned by Saldus Municipality into a sports hall. A low-energy building with an annual energy consumption for heating of not more than 50 kWh/m² and a total energy consumption of not more than 120 kWh/m² is planned. 1. Improvement of the external envelopes of the building, including insulation of facade, roof, foundations and floor, replacement of doors and windows;2. Improvement of technical systems (reconstruction and modernisation of heating, ventilation and lighting systems);3. Purchase and installation of solar collectors with a total system power of 14.624 kW for the production of heat required by hot water;4. The aim of the project is to reduce the consumption of primary energy in the Saldus sports house as a result of measures that promote energy efficiency, in accordance with the priorities of Saldus municipality development programme.Planned indicators after implementation of the project (in 2020):1) Reduction of annual consumption of primary energy in Saldus sports house, 2) Reduction of annual energy consumption of 227851 kWh/year, 2) Additional capacity produced by the AER equipment 0.015 MWh per year, 3) Greenhouse gas reduction 46.648 CO2 tons per year.The project is planned to be implemented within 27 months from the project’s total costs, the total costs of the project – EUR 54 39, EUR 2263989 % reduction of greenhouse gases 46.648 CO2 tons per year.The project is to be implemented within 27 months from the agreement on the implementation of the project. (English) / qualifier
 
point in time: 15 July 2021
Timestamp+2021-07-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:42, 15 July 2021

Project Q3057138 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057138 in Latvia

    Statements

    0 references
    0 references
    275,234.6 Euro
    0 references
    506,038.98 Euro
    0 references
    14 September 2017
    0 references
    13 December 2019
    0 references
    Saldus novada pašvaldība
    0 references
    0 references

    56°40'2.82"N, 22°29'55.64"E
    0 references
    Projektā plānotas investīcijas Saldus novada pašvaldībai piederošās Saldus sporta skolas vecās sporta nama ēkas pārbūvei par sporta halli. Plānots izbūvēt zema energopatēriņa ēku, kam ikgadējais enerģijas patēriņš apkurei nav lielāks par 50 kWh/m2, bet kopējais enerģijas patēriņš nav lielāks par 120 kWh/m2.Plānotie pasākumi: 1. Ēkas ārējo norobežojošo konstrukciju uzlabošana, tajā skaitā, fasādes, jumta, pamatu un grīdas siltināšana, durvju un logu nomaiņa;2. Tehnisko sistēmu uzlabošana (apkures, ventilācijas un apgaismojuma sistēmu pārbūve un modernizācija);3. Saules kolektoru ar kopējo sistēmas jaudu 14,624 kW iegāde un uzstādīšana karstā ūdens nepieciešamās siltumenerģijas ražošanai;4. Citi būvdarbi atbilstoši būvprojektam.Projekta mērķis ir samazināt primārās enerģijas patēriņu Saldus sporta nama ēkā energoefektivitāti veicinošu pasākumu rezultātā, atbilstoši Saldus novada pašvaldības attīstības programmas prioritātēm.Plānotie sasniedzamie rādītāji pēc projekta realizācijas (2020.gadā):1) Primārās enerģijas gada patēriņa samazinājums 227 851 kWh/gadā,2) AER iekārtu saražotā papildjauda 0,015 MWh gadā,3) Siltumnīcefekta gāzu samazinājums 46,648 CO2 tonnas gadā.Projektu plānots realizēt 27 mēnešu laikā no vienošanās par projekta īstenošanu noslēgšanas.Projekta kopējās izmaksas - 2 263 989,40 EUR, kopējās attiecināmās izmaksas - 509 769,39 EUR, no tām ERAF finansējums 54,39% jeb 277 238,21 EUR. (Latvian)
    0 references
    In the project investments are planned to rebuild the old sports house building of Saldus Sports School owned by Saldus Municipality into a sports hall. A low-energy building with an annual energy consumption for heating of not more than 50 kWh/m² and a total energy consumption of not more than 120 kWh/m² is planned. 1. Improvement of the external envelopes of the building, including insulation of facade, roof, foundations and floor, replacement of doors and windows;2. Improvement of technical systems (reconstruction and modernisation of heating, ventilation and lighting systems);3. Purchase and installation of solar collectors with a total system power of 14.624 kW for the production of heat required by hot water;4. The aim of the project is to reduce the consumption of primary energy in the Saldus sports house as a result of measures that promote energy efficiency, in accordance with the priorities of Saldus municipality development programme.Planned indicators after implementation of the project (in 2020):1) Reduction of annual consumption of primary energy in Saldus sports house, 2) Reduction of annual energy consumption of 227851 kWh/year, 2) Additional capacity produced by the AER equipment 0.015 MWh per year, 3) Greenhouse gas reduction 46.648 CO2 tons per year.The project is planned to be implemented within 27 months from the project’s total costs, the total costs of the project – EUR 54 39, EUR 2263989 % reduction of greenhouse gases 46.648 CO2 tons per year.The project is to be implemented within 27 months from the agreement on the implementation of the project. (English)
    15 July 2021
    0 references
    Jelgavas iela 6, Saldus, Saldus nov., LV-3801
    0 references

    Identifiers

    4.2.2.0/17/I/005