Improvement of energy efficiency of Rezekne City State 1st Gymnasium buildings at Dzirnavu Street 3a, Rezekne (Q3057084): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The aim of the project is to promote energy efficiency improvement in Rezekne State Gymnasium building 1 Dzirnavu Street 3a, Rezekne by performing reconstruction works that reduce primary energy consumption and municipal expenditure on heating, thus ensuring the efficiency of investments both in terms of costs and socio-economic benefits.The main activities of the project are energy efficiency improvement works – insulation of exterior walls and...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Improvement of energy efficiency of Rezekne City State 1st Gymnasium buildings at Dzirnavu Street 3a, Rezekne |
Revision as of 12:41, 15 July 2021
Project Q3057084 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of energy efficiency of Rezekne City State 1st Gymnasium buildings at Dzirnavu Street 3a, Rezekne |
Project Q3057084 in Latvia |
Statements
905,743.44 Euro
0 references
2,964,170.49 Euro
0 references
22 March 2019
0 references
20 December 2020
0 references
RĒZEKNES PILSĒTAS DOME
0 references
Projekta mērķis ir energoefektivitātes paaugstināšanas sekmēšana Rēzeknes Valsts 1.ģimnāzijas ēkā Dzirnavu ielā 3a, Rēzeknē, veicot ēkas pārbūves darbus, kas samazina primārās enerģijas patēriņu un pašvaldības izdevumus par siltumapgādi, tādējādi nodrošinot investīciju efektivitāti gan izmaksu, gan sociālekonomisko ieguvumu ziņā.Projekta galvenās darbības ir energoefektivitātes uzlabošanas būvdarbi - ārsienu un cokola siltināšana; jumtu pārseguma un grīdas siltināšana; logu nomaiņa; ventilācijas sistēmas un to elementu izbūve un pārbūve; apkures sistēmas un to elementu pārbūve; apgaismojuma pārbūve; būvdarbu autoruzraudzība, būvuzraudzība un publicitātes pasākumi.Plānotie rezultāti: primārās enerģijas patēriņa samazinājums par 695 940,84 kWh/gadā un siltumnīcefekta gāzu samazinājums par 221,86 t CO2 /gadā.Projekta ideja atbilst Rēzeknes pilsētas attīstības stratēģiskajiem mērķiem un ir iekļauta Rēzeknes pilsētas attīstības programmas 2014.-2020.gadam Investīciju plānā.Projekta ilgums: 2019.gada marts - 2020.gada decembrisProjekta kopējās izmaksas EUR 3 502 839.12, no kurām ERAF finansējums sastāda EUR 905743.44, valsts dotācija EUR 514 579.99 un pašvaldības finansējums EUR 1 543 847.06. neattiecināmas izmaksas - 538 668.63 EUR. (Latvian)
0 references
The aim of the project is to promote energy efficiency improvement in Rezekne State Gymnasium building 1 Dzirnavu Street 3a, Rezekne by performing reconstruction works that reduce primary energy consumption and municipal expenditure on heating, thus ensuring the efficiency of investments both in terms of costs and socio-economic benefits.The main activities of the project are energy efficiency improvement works – insulation of exterior walls and caps; Roof covering and floor insulation; Replacement of windows; Construction and reconstruction of the ventilation system and their elements; Reconstruction of the heating system and their elements; Refurbishment of lighting; Author supervision of construction works, construction supervision and publicity measures. Reduction of primary energy consumption by 695940.84 kWh/year and greenhouse gas reduction by 221.86 t CO2/year.The project idea corresponds to the strategic goals of Rezekne city development and is included in Rezekne City Development Programme 2014-2020 Investment Plan.Project duration: March 2019 – December 2020 Project total costs EUR 3 502 839.12, of which ERDF funding is EUR 905743.44, state grant EUR 514 579.99 and municipal funding EUR 1 543 847.06. ineligible costs – EUR 538668.63. (English)
15 July 2021
0 references
Dzirnavu iela 3A, Rēzekne, LV-4601
0 references
Identifiers
4.2.2.0/17/I/111
0 references