Q3057050 (Q3057050): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): The aim of the project shall be: “Tenisa centrs "Lielupe" Ltd. for the Oskars Kalpaka prospekts building 16, improving energy efficiency in Jurmala, ensuring improvement of the building’s facade heat performance, reducing heat losses of the building through its enclosing structures, carrying out full reconstruction of the heating system, thus increasing the efficiency of the heating system. Replacement of the existing lighting in the premises ag...)
Property / summary
 
The aim of the project shall be: “Tenisa centrs "Lielupe" Ltd. for the Oskars Kalpaka prospekts building 16, improving energy efficiency in Jurmala, ensuring improvement of the building’s facade heat performance, reducing heat losses of the building through its enclosing structures, carrying out full reconstruction of the heating system, thus increasing the efficiency of the heating system. Replacement of the existing lighting in the premises against energy-efficient lighting, thus reducing energy consumption, improving the visual appearance of the building, thus increasing the longevity of the building’s supporting structures and the life of the building.The planned activities within the project are directly aimed at the fulfilment of this objective.Renovation of the uninsulated facades of the building will be carried out in accordance with the developed construction project, the energy certificate of the building and taking into account the stated in the technical survey opinion, the renovation of the building’s uninsulated facades, the construction of the construction of the building’s non-insulated facade, the building’s energy certificate and taking into account the technical survey opinion, the renovation of the building’s uninsulated facades, the construction of the building as well as the construction of the building’s exterior construction, as well as the outdoor construction of the building, as well as the outdoor construction of the facade, as well as the outdoor construction of the building (installation of the outside facades), as well as the construction of the construction of the building as well as the construction of the outdoor construction of the building (installation of the building as well as the external construction of the building, as well as the outdoor construction of the building, as well as the outdoor construction of the building. Energy efficient lighting construction and ventilation system with heat recovery are envisaged. After the construction of building envelopes, a density test (Blower-door), for control of the density of building envelopes (to be achieved value n50 = 0.2 1/h).The project is implemented in accordance with SIA “Tenisa centrs Lielupe” Medium-term operational strategy 2016. The year 2020. In order to ensure fulfilment of the specific objective of the Regulations of the Cabinet of Ministers of 4 January 2018 No.13 "Promoting Energy Efficiency in Public and Residential Buildings" clause 4.2.1.2 "Promoting energy efficiency improvement in public buildings" implementation rules of the second project target "To promote energy efficiency in public buildings" (henceforward – SAM 4.2.1.2.Implementation Regulation), SIA "Tenisa Centre "Lielupe" plans to carry out the following construction works-door change against new building-door blocks; in the case of new building blocks; in the case of new building blocks; in the case of the new building blocks; in the case of the new building blocks; in the case of the new building blocks; in order to achieve the specific objective of the Regulation of the Cabinet of Ministers No 13 "Promotion of Energy Efficiency in Public Buildings "Operation of Operational Programme "Growth and Employment" of implementation of the second project target "To promote energy efficiency in public and residential buildings" (henceforward – implementation rules of SAM 4.2.1.2). Construction of a heating unit;-construction of management and automation system for ventilation, heating, power supply and heating system and construction of a new ventilation system;-replacement of existing lighting with energy-efficient lighting.Project site – Oskara Kalpaka prospekts 16, JurmalaProject duration: Three months from the conclusion of the project contract. The activities related to the preparation of the project application started in February 2017, when the technical survey of the building and the energy audit were carried out for the building "Tenisa centrs "Lielupe" Ltd. in Oskarsa Kalpaka prospekts 16, Jūrmala.The total cost of the project is EUR 11206287.82., incl. – European Regional Development Fund funding – EUR 1228487.01; — eligible national budget funding – EUR 216791,83;-ineligible costs – EUR 9761008,98. The implementation of the project will ensure that the following results will be achieved: Heat energy savings after project implementation will be no less than 31.43 % of the annual heat consumption calculated in the energy certificate of the building prior to implementation of the project; — the heat consumption for heating after the implementation of the project, on the basis of the calculations made in the energy certificate of the building and the works envisaged in the technical design documentation, shall not exceed 58,12 kWh/m² per year;--a reduction of annual primary energy consumption: 183,238 MWh/year; Estimated greenhouse gas reduction of 23.84 tonnes of CO2 equivalent per year. (English)
Property / summary: The aim of the project shall be: “Tenisa centrs "Lielupe" Ltd. for the Oskars Kalpaka prospekts building 16, improving energy efficiency in Jurmala, ensuring improvement of the building’s facade heat performance, reducing heat losses of the building through its enclosing structures, carrying out full reconstruction of the heating system, thus increasing the efficiency of the heating system. Replacement of the existing lighting in the premises against energy-efficient lighting, thus reducing energy consumption, improving the visual appearance of the building, thus increasing the longevity of the building’s supporting structures and the life of the building.The planned activities within the project are directly aimed at the fulfilment of this objective.Renovation of the uninsulated facades of the building will be carried out in accordance with the developed construction project, the energy certificate of the building and taking into account the stated in the technical survey opinion, the renovation of the building’s uninsulated facades, the construction of the construction of the building’s non-insulated facade, the building’s energy certificate and taking into account the technical survey opinion, the renovation of the building’s uninsulated facades, the construction of the building as well as the construction of the building’s exterior construction, as well as the outdoor construction of the building, as well as the outdoor construction of the facade, as well as the outdoor construction of the building (installation of the outside facades), as well as the construction of the construction of the building as well as the construction of the outdoor construction of the building (installation of the building as well as the external construction of the building, as well as the outdoor construction of the building, as well as the outdoor construction of the building. Energy efficient lighting construction and ventilation system with heat recovery are envisaged. After the construction of building envelopes, a density test (Blower-door), for control of the density of building envelopes (to be achieved value n50 = 0.2 1/h).The project is implemented in accordance with SIA “Tenisa centrs Lielupe” Medium-term operational strategy 2016. The year 2020. In order to ensure fulfilment of the specific objective of the Regulations of the Cabinet of Ministers of 4 January 2018 No.13 "Promoting Energy Efficiency in Public and Residential Buildings" clause 4.2.1.2 "Promoting energy efficiency improvement in public buildings" implementation rules of the second project target "To promote energy efficiency in public buildings" (henceforward – SAM 4.2.1.2.Implementation Regulation), SIA "Tenisa Centre "Lielupe" plans to carry out the following construction works-door change against new building-door blocks; in the case of new building blocks; in the case of new building blocks; in the case of the new building blocks; in the case of the new building blocks; in the case of the new building blocks; in order to achieve the specific objective of the Regulation of the Cabinet of Ministers No 13 "Promotion of Energy Efficiency in Public Buildings "Operation of Operational Programme "Growth and Employment" of implementation of the second project target "To promote energy efficiency in public and residential buildings" (henceforward – implementation rules of SAM 4.2.1.2). Construction of a heating unit;-construction of management and automation system for ventilation, heating, power supply and heating system and construction of a new ventilation system;-replacement of existing lighting with energy-efficient lighting.Project site – Oskara Kalpaka prospekts 16, JurmalaProject duration: Three months from the conclusion of the project contract. The activities related to the preparation of the project application started in February 2017, when the technical survey of the building and the energy audit were carried out for the building "Tenisa centrs "Lielupe" Ltd. in Oskarsa Kalpaka prospekts 16, Jūrmala.The total cost of the project is EUR 11206287.82., incl. – European Regional Development Fund funding – EUR 1228487.01; — eligible national budget funding – EUR 216791,83;-ineligible costs – EUR 9761008,98. The implementation of the project will ensure that the following results will be achieved: Heat energy savings after project implementation will be no less than 31.43 % of the annual heat consumption calculated in the energy certificate of the building prior to implementation of the project; — the heat consumption for heating after the implementation of the project, on the basis of the calculations made in the energy certificate of the building and the works envisaged in the technical design documentation, shall not exceed 58,12 kWh/m² per year;--a reduction of annual primary energy consumption: 183,238 MWh/year; Estimated greenhouse gas reduction of 23.84 tonnes of CO2 equivalent per year. (English) / rank
 
Normal rank
Property / summary: The aim of the project shall be: “Tenisa centrs "Lielupe" Ltd. for the Oskars Kalpaka prospekts building 16, improving energy efficiency in Jurmala, ensuring improvement of the building’s facade heat performance, reducing heat losses of the building through its enclosing structures, carrying out full reconstruction of the heating system, thus increasing the efficiency of the heating system. Replacement of the existing lighting in the premises against energy-efficient lighting, thus reducing energy consumption, improving the visual appearance of the building, thus increasing the longevity of the building’s supporting structures and the life of the building.The planned activities within the project are directly aimed at the fulfilment of this objective.Renovation of the uninsulated facades of the building will be carried out in accordance with the developed construction project, the energy certificate of the building and taking into account the stated in the technical survey opinion, the renovation of the building’s uninsulated facades, the construction of the construction of the building’s non-insulated facade, the building’s energy certificate and taking into account the technical survey opinion, the renovation of the building’s uninsulated facades, the construction of the building as well as the construction of the building’s exterior construction, as well as the outdoor construction of the building, as well as the outdoor construction of the facade, as well as the outdoor construction of the building (installation of the outside facades), as well as the construction of the construction of the building as well as the construction of the outdoor construction of the building (installation of the building as well as the external construction of the building, as well as the outdoor construction of the building, as well as the outdoor construction of the building. Energy efficient lighting construction and ventilation system with heat recovery are envisaged. After the construction of building envelopes, a density test (Blower-door), for control of the density of building envelopes (to be achieved value n50 = 0.2 1/h).The project is implemented in accordance with SIA “Tenisa centrs Lielupe” Medium-term operational strategy 2016. The year 2020. In order to ensure fulfilment of the specific objective of the Regulations of the Cabinet of Ministers of 4 January 2018 No.13 "Promoting Energy Efficiency in Public and Residential Buildings" clause 4.2.1.2 "Promoting energy efficiency improvement in public buildings" implementation rules of the second project target "To promote energy efficiency in public buildings" (henceforward – SAM 4.2.1.2.Implementation Regulation), SIA "Tenisa Centre "Lielupe" plans to carry out the following construction works-door change against new building-door blocks; in the case of new building blocks; in the case of new building blocks; in the case of the new building blocks; in the case of the new building blocks; in the case of the new building blocks; in order to achieve the specific objective of the Regulation of the Cabinet of Ministers No 13 "Promotion of Energy Efficiency in Public Buildings "Operation of Operational Programme "Growth and Employment" of implementation of the second project target "To promote energy efficiency in public and residential buildings" (henceforward – implementation rules of SAM 4.2.1.2). Construction of a heating unit;-construction of management and automation system for ventilation, heating, power supply and heating system and construction of a new ventilation system;-replacement of existing lighting with energy-efficient lighting.Project site – Oskara Kalpaka prospekts 16, JurmalaProject duration: Three months from the conclusion of the project contract. The activities related to the preparation of the project application started in February 2017, when the technical survey of the building and the energy audit were carried out for the building "Tenisa centrs "Lielupe" Ltd. in Oskarsa Kalpaka prospekts 16, Jūrmala.The total cost of the project is EUR 11206287.82., incl. – European Regional Development Fund funding – EUR 1228487.01; — eligible national budget funding – EUR 216791,83;-ineligible costs – EUR 9761008,98. The implementation of the project will ensure that the following results will be achieved: Heat energy savings after project implementation will be no less than 31.43 % of the annual heat consumption calculated in the energy certificate of the building prior to implementation of the project; — the heat consumption for heating after the implementation of the project, on the basis of the calculations made in the energy certificate of the building and the works envisaged in the technical design documentation, shall not exceed 58,12 kWh/m² per year;--a reduction of annual primary energy consumption: 183,238 MWh/year; Estimated greenhouse gas reduction of 23.84 tonnes of CO2 equivalent per year. (English) / qualifier
 
point in time: 15 July 2021
Timestamp+2021-07-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:41, 15 July 2021

Project Q3057050 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057050 in Latvia

    Statements

    0 references
    1,228,487.01 Euro
    0 references
    1,445,278.84 Euro
    0 references
    9 September 2019
    0 references
    8 December 2019
    0 references
    Sabiedrība ar ierobežotu atbildību "Tenisa centrs "Lielupe""
    0 references
    0 references

    56°59'6.43"N, 23°52'37.31"E
    0 references
    Projekta mērķis: SIA "Tenisa centrs "Lielupe"" ēkai Oskara Kalpaka prospektā 16, Jūrmalā energoefektivitātes paaugstināšana, nodrošinot ēkas fasāžu siltumtehnisko rādītāju uzlabošanos, samazinot ēkas siltuma zudumus caur tās norobežojošām konstrukcijām, veicot pilnu apkures sistēmas rekonstrukciju, tādējādi paaugstinot apkures sistēmas efektivitāti. Esošā apgaismojuma nomaiņu telpās pret energoefektīvu apgaismojumu, tādējādi samazinot enerģijas patēriņu, uzlabojot ēkas vizuālo izskatu, tādejādi palielinot ēkas nesošo konstrukciju ilgmūžību un ēkas ekspluatācijas laiku.Projekta ietvaros plānotās darbības ir tieši vērstas uz šī mērķa izpildi.Tiks veikta ēkas nesiltināto fasāžu renovācija atbilstoši izstrādātajam būvprojektam, ēkas energosertifikātam un ņemot vērā ēkas tehniskās apsekošanas atzinumā fiksēto, tiks veikta ēkas nesiltināto fasāžu renovācija – cokola siltināšana, ārsienu sendvičpaneļu izbūve, logu un ārdurvju izbūve (esošo nomaiņa), jumta siltinājuma un seguma izbūve, kā arī inženiertīklu izbūve. Paredzēta energoefektīva apgaismojuma izbūve un ventilācijas sistēma ar siltuma atgūšanu. Pēc ēkas norobežojošo konstrukciju izbūves paredzēts blīvuma tests (Blower-door), ēkas norobežojošo konstrukciju blīvuma kontrolei (sasniedzamā vērtība n50 = 0.2 1/h) .Projekts tiek īstenots saskaņā ar SIA “Tenisa centrs “Lielupe”” Vidēja termiņa darbības stratēģiju 2016. – 2020.gadam. Lai nodrošinātu 2018.gada 4.janvāra Ministru kabineta noteikumos Nr.13 „Darbības programmas "Izaugsme un nodarbinātība" 4.2.1.specifiskā atbalsta mērķa "Veicināt energoefektivitātes paaugstināšanu valsts un dzīvojamās ēkās" 4.2.1.2.pasākuma "Veicināt energoefektivitātes paaugstināšanu valsts ēkās" otrās projektu iesniegumu atlases kārtas īstenošanas noteikumi” (turpmāk – SAM 4.2.1.2. īstenošanas noteikumi) noteiktā specifiskā mērķa sasniegšanu, SIA “Tenisa centrs “Lielupe”” plāno veikt šādus būvdarbus:-ēkas sienu siltināšanu;-jumta siltumizolācijas ierīkošana;-veco esošo logu maiņa pret jauniem PVC logu blokiem;-veco ārdurvju maiņa pret jauniem durvju blokiem;-apkures sistēmas rekonstrukcija, uzstādot jaunus radiatorus un termoregulatorus; -siltummezgla izbūve;-vadības un automatizācijas sistēmas izbūve ventilācijas, apkures, elektroapgādes sistēmām un siltummezglam un jaunas ventilācijas sistēmas izbūve;-veikta esošā apgaismojuma nomaiņa pret energoefektīvu apgaismojumu.Projekta īstenošanas vieta - Oskara Kalpaka prospektā 16, JūrmalāProjekta ilgums: trīs mēneši no projekta līguma noslēgšanas. Ar projekta iesnieguma sagatavošanu saistītās darbības uzsāktas 2017.gada februāri, kad tika veikts ēkas tehniskās apsekošanas atzinums un energoaudits SIA "Tenisa centrs "Lielupe"" ēkai Oskara Kalpaka prospektā 16, Jūrmalā.Projekta kopējās izmaksas ir 11 206 287,82 EUR., t.sk.-Eiropas Reģionālās attīstības fonda finansējums – 1 228 487,01 EUR; -attiecināmais valsts budžeta finansējums – 216 791,83 EUR;-neattiecināmās izmaksas – 9 761 008,98 EUR.Plānotie rezultāti: Projekta īstenošana nodrošinās, ka tiks sasniegti šādi rezultāti: -siltumenerģijas ietaupījums pēc projekta īstenošanas būs ne mazāks kā 31,43% gadā no ēkas energosertifikātā aprēķinātā siltumenerģijas patēriņa pirms projekta īstenošanas; -siltumenerģijas patēriņš apkurei pēc projekta īstenošanas, pamatojoties uz ēkas energosertifikātā veiktajiem aprēķiniem un projekta tehniskajā dokumentācijā paredzētajiem būvdarbiem nepārsniegs 58,12 kWh/m2 gadā;-primārās enerģijas gada patēriņa samazinājums - 183,238 MWh/gadā; -aprēķinātais siltumnīcefekta gāzu samazinājums - 23,84 CO2 ekvivalenta tonnas gadā. (Latvian)
    0 references
    The aim of the project shall be: “Tenisa centrs "Lielupe" Ltd. for the Oskars Kalpaka prospekts building 16, improving energy efficiency in Jurmala, ensuring improvement of the building’s facade heat performance, reducing heat losses of the building through its enclosing structures, carrying out full reconstruction of the heating system, thus increasing the efficiency of the heating system. Replacement of the existing lighting in the premises against energy-efficient lighting, thus reducing energy consumption, improving the visual appearance of the building, thus increasing the longevity of the building’s supporting structures and the life of the building.The planned activities within the project are directly aimed at the fulfilment of this objective.Renovation of the uninsulated facades of the building will be carried out in accordance with the developed construction project, the energy certificate of the building and taking into account the stated in the technical survey opinion, the renovation of the building’s uninsulated facades, the construction of the construction of the building’s non-insulated facade, the building’s energy certificate and taking into account the technical survey opinion, the renovation of the building’s uninsulated facades, the construction of the building as well as the construction of the building’s exterior construction, as well as the outdoor construction of the building, as well as the outdoor construction of the facade, as well as the outdoor construction of the building (installation of the outside facades), as well as the construction of the construction of the building as well as the construction of the outdoor construction of the building (installation of the building as well as the external construction of the building, as well as the outdoor construction of the building, as well as the outdoor construction of the building. Energy efficient lighting construction and ventilation system with heat recovery are envisaged. After the construction of building envelopes, a density test (Blower-door), for control of the density of building envelopes (to be achieved value n50 = 0.2 1/h).The project is implemented in accordance with SIA “Tenisa centrs Lielupe” Medium-term operational strategy 2016. The year 2020. In order to ensure fulfilment of the specific objective of the Regulations of the Cabinet of Ministers of 4 January 2018 No.13 "Promoting Energy Efficiency in Public and Residential Buildings" clause 4.2.1.2 "Promoting energy efficiency improvement in public buildings" implementation rules of the second project target "To promote energy efficiency in public buildings" (henceforward – SAM 4.2.1.2.Implementation Regulation), SIA "Tenisa Centre "Lielupe" plans to carry out the following construction works-door change against new building-door blocks; in the case of new building blocks; in the case of new building blocks; in the case of the new building blocks; in the case of the new building blocks; in the case of the new building blocks; in order to achieve the specific objective of the Regulation of the Cabinet of Ministers No 13 "Promotion of Energy Efficiency in Public Buildings "Operation of Operational Programme "Growth and Employment" of implementation of the second project target "To promote energy efficiency in public and residential buildings" (henceforward – implementation rules of SAM 4.2.1.2). Construction of a heating unit;-construction of management and automation system for ventilation, heating, power supply and heating system and construction of a new ventilation system;-replacement of existing lighting with energy-efficient lighting.Project site – Oskara Kalpaka prospekts 16, JurmalaProject duration: Three months from the conclusion of the project contract. The activities related to the preparation of the project application started in February 2017, when the technical survey of the building and the energy audit were carried out for the building "Tenisa centrs "Lielupe" Ltd. in Oskarsa Kalpaka prospekts 16, Jūrmala.The total cost of the project is EUR 11206287.82., incl. – European Regional Development Fund funding – EUR 1228487.01; — eligible national budget funding – EUR 216791,83;-ineligible costs – EUR 9761008,98. The implementation of the project will ensure that the following results will be achieved: Heat energy savings after project implementation will be no less than 31.43 % of the annual heat consumption calculated in the energy certificate of the building prior to implementation of the project; — the heat consumption for heating after the implementation of the project, on the basis of the calculations made in the energy certificate of the building and the works envisaged in the technical design documentation, shall not exceed 58,12 kWh/m² per year;--a reduction of annual primary energy consumption: 183,238 MWh/year; Estimated greenhouse gas reduction of 23.84 tonnes of CO2 equivalent per year. (English)
    15 July 2021
    0 references
    Oskara Kalpaka prospekts 16, Jūrmala, LV-2010
    0 references

    Identifiers

    4.2.1.2/18/I/026
    0 references