(‎Created claim: summary (P836): Limited liability company “Bulduru Secondary School of Gardening” (hereinafter – Company) is a structural unit of the Latvian University of Agriculture (capital company) under the Ministry of Agriculture, the main aim of which is to provide quality, competitive and European labour market vocational education and further education in gardening, landscape architecture, catering and hospitality services, as well as preparation for continuing educat...)
Property / summary
 
Limited liability company “Bulduru Secondary School of Gardening” (hereinafter – Company) is a structural unit of the Latvian University of Agriculture (capital company) under the Ministry of Agriculture, the main aim of which is to provide quality, competitive and European labour market vocational education and further education in gardening, landscape architecture, catering and hospitality services, as well as preparation for continuing education at a higher education level.The Society has organised its economic and administrative activities both historically and currently in the complex and adjacent territory of Viestura iela 6. The aim of this project is to implement energy efficiency-enhancing measures in the three buildings of the Bulduri Secondary School of Gardening, which are related to the improvement of building envelopes and engineering systems, thus significantly improving the technical condition of the buildings and at the same time substantially reducing the necessary energy consumption to ensure the thermal stability of buildings. Project eligible costs are planned to promote energy efficiency – insulation of building envelope structures, additional insulation of existing windows and door sections, as well as replacement of windows with new glass package windows, renovation of entrance nodes, renovation of heating system and heating unit, renewal of electrical supply system and distribution wiring, renovation of lighting system, ventilation and heating system renovation, cold and hot water and sewerage system renovation, lightning protection and heating system renovation, project supervision project implementation project implementation time as well as related construction costs. 33 months from the conclusion of the contract on project implementation, until October 31, 2022.Project total costs: EUR 4722922,98, of which project eligible costs EUR 3741331,34, ineligible costs – EUR 981591,64.The eligible costs of the project by financial sources – requested ERDF co-financing: Within the project, after the implementation of energy efficiency improvement measures, it is planned to achieve energy reduction for all three buildings totalling 1820.39 MWh/year, while energy consumption for heating the secondary school building will not exceed 86.74 kWh/m² per year after the implementation of the project, it is planned to achieve energy reduction for all three buildings in total for 1820.39 MWh/m², and energy consumption for the 3rd day building of the secondary school building will not exceed 86.74 kWh/m² per year, for the 2nd day hotel building in secondary school – 67.06 kWh/m² and for the 3rd day high school hotel building – 68.28 kWh/m². 461.35 tons CO2/year (for secondary school building – 302.82 tons CO2/year, secondary school for 2nd service hotel building – 80.20 tons CO2/year and secondary school 3rd service hotel building – 78.33 tonnes CO2/year). (English)
Property / summary: Limited liability company “Bulduru Secondary School of Gardening” (hereinafter – Company) is a structural unit of the Latvian University of Agriculture (capital company) under the Ministry of Agriculture, the main aim of which is to provide quality, competitive and European labour market vocational education and further education in gardening, landscape architecture, catering and hospitality services, as well as preparation for continuing education at a higher education level.The Society has organised its economic and administrative activities both historically and currently in the complex and adjacent territory of Viestura iela 6. The aim of this project is to implement energy efficiency-enhancing measures in the three buildings of the Bulduri Secondary School of Gardening, which are related to the improvement of building envelopes and engineering systems, thus significantly improving the technical condition of the buildings and at the same time substantially reducing the necessary energy consumption to ensure the thermal stability of buildings. Project eligible costs are planned to promote energy efficiency – insulation of building envelope structures, additional insulation of existing windows and door sections, as well as replacement of windows with new glass package windows, renovation of entrance nodes, renovation of heating system and heating unit, renewal of electrical supply system and distribution wiring, renovation of lighting system, ventilation and heating system renovation, cold and hot water and sewerage system renovation, lightning protection and heating system renovation, project supervision project implementation project implementation time as well as related construction costs. 33 months from the conclusion of the contract on project implementation, until October 31, 2022.Project total costs: EUR 4722922,98, of which project eligible costs EUR 3741331,34, ineligible costs – EUR 981591,64.The eligible costs of the project by financial sources – requested ERDF co-financing: Within the project, after the implementation of energy efficiency improvement measures, it is planned to achieve energy reduction for all three buildings totalling 1820.39 MWh/year, while energy consumption for heating the secondary school building will not exceed 86.74 kWh/m² per year after the implementation of the project, it is planned to achieve energy reduction for all three buildings in total for 1820.39 MWh/m², and energy consumption for the 3rd day building of the secondary school building will not exceed 86.74 kWh/m² per year, for the 2nd day hotel building in secondary school – 67.06 kWh/m² and for the 3rd day high school hotel building – 68.28 kWh/m². 461.35 tons CO2/year (for secondary school building – 302.82 tons CO2/year, secondary school for 2nd service hotel building – 80.20 tons CO2/year and secondary school 3rd service hotel building – 78.33 tonnes CO2/year). (English) / rank
 
Normal rank
Property / summary: Limited liability company “Bulduru Secondary School of Gardening” (hereinafter – Company) is a structural unit of the Latvian University of Agriculture (capital company) under the Ministry of Agriculture, the main aim of which is to provide quality, competitive and European labour market vocational education and further education in gardening, landscape architecture, catering and hospitality services, as well as preparation for continuing education at a higher education level.The Society has organised its economic and administrative activities both historically and currently in the complex and adjacent territory of Viestura iela 6. The aim of this project is to implement energy efficiency-enhancing measures in the three buildings of the Bulduri Secondary School of Gardening, which are related to the improvement of building envelopes and engineering systems, thus significantly improving the technical condition of the buildings and at the same time substantially reducing the necessary energy consumption to ensure the thermal stability of buildings. Project eligible costs are planned to promote energy efficiency – insulation of building envelope structures, additional insulation of existing windows and door sections, as well as replacement of windows with new glass package windows, renovation of entrance nodes, renovation of heating system and heating unit, renewal of electrical supply system and distribution wiring, renovation of lighting system, ventilation and heating system renovation, cold and hot water and sewerage system renovation, lightning protection and heating system renovation, project supervision project implementation project implementation time as well as related construction costs. 33 months from the conclusion of the contract on project implementation, until October 31, 2022.Project total costs: EUR 4722922,98, of which project eligible costs EUR 3741331,34, ineligible costs – EUR 981591,64.The eligible costs of the project by financial sources – requested ERDF co-financing: Within the project, after the implementation of energy efficiency improvement measures, it is planned to achieve energy reduction for all three buildings totalling 1820.39 MWh/year, while energy consumption for heating the secondary school building will not exceed 86.74 kWh/m² per year after the implementation of the project, it is planned to achieve energy reduction for all three buildings in total for 1820.39 MWh/m², and energy consumption for the 3rd day building of the secondary school building will not exceed 86.74 kWh/m² per year, for the 2nd day hotel building in secondary school – 67.06 kWh/m² and for the 3rd day high school hotel building – 68.28 kWh/m². 461.35 tons CO2/year (for secondary school building – 302.82 tons CO2/year, secondary school for 2nd service hotel building – 80.20 tons CO2/year and secondary school 3rd service hotel building – 78.33 tonnes CO2/year). (English) / qualifier
 
point in time: 15 July 2021
Timestamp+2021-07-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:41, 15 July 2021

Project Q3057021 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057021 in Latvia

    Statements

    0 references
    3,180,131.64 Euro
    0 references
    3,741,331.34 Euro
    0 references
    14 February 2020
    0 references
    31 October 2022
    0 references
    Sabiedrība ar ierobežotu atbildību Bulduru Dārzkopības vidusskola
    0 references
    0 references

    56°58'50.56"N, 23°52'5.41"E
    0 references
    Sabiedrība ar ierobežotu atbildību “Bulduru Dārzkopības vidusskola” (turpmāk – Sabiedrība) ir Zemkopības ministrijas pakļautībā esošās Latvijas Lauksaimniecības universitātes struktūrvienība (kapitālsabiedrība), kuras pamatmērķis ir sniegt kvalitatīvu, konkurētspējīgu un Eiropas darba tirgus prasībām atbilstošu vidējo profesionālo izglītību un tālākizglītību ar dārzkopību, ainavu arhitektūru, ēdināšanas un viesmīlības pakalpojumiem saistītās specialitātēs, kā arī sagatavošanu izglītības turpināšanai augstākā izglītības pakāpē.Sabiedrība savu saimniecisko un administratīvo darbību gan vēsturiski, gan šobrīd ir organizējusi ēku kompleksā un pieguļošajā teritorijā Viestura ielā 6, Jūrmalā. Šī projekta mērķis ir veikt energoefektivitātes veicinošus pasākumus trijās Bulduru Dārzkopības vidusskolas kompleksa ēkās, kas saistīti ar ēku norobežojošo konstrukciju un inženiersistēmu uzlabošanu, tādejādi ievērojami uzlabojot ēku tehnisko stāvokli un vienlaikus būtiski samazinot nepieciešamo enerģijas patēriņu ēku siltumnoturības nodrošināšanai. Projektā kā attiecināmās izmaksas plānoti šādi energoefektivitāti veicinoši pasākumi – ēku norobežojošo konstrukciju siltināšana, esošo logu un durvju aiļu papildus siltināšana, kā arī logu nomaiņa pret jauniem stikla pakešu logiem, ieejas mezglu atjaunošana, siltumapgādes sistēmas un siltummezgla atjaunošana, elektroapgādes sistēmas un sadales elektroinstalācijas atjaunošana, apgaismojuma sistēmas atjaunošana, ventilācijas un apkures sistēmas atjaunošana, aukstā un karstā ūdens un kanalizācijas sistēmas atjaunošana, zibensaizsardzības un ugunsdzēsības sistēmas izbūve, kā arī ar projekta sekmīgu īstenošanu un LR būvnormatīviem saistītās izmaksas - projekta vadības, būvprojektu izstrādes, būvuzraudzības un autoruzraudzības izmaksas.Projekta īstenošanas laiks: 33 mēneši no līguma par projekta īstenošanu noslēgšanas, līdz 2022.gada 31.oktobrim.Projekta kopējās izmaksas: 4 722 922,98 EUR, no tām projekta attiecināmās izmaksas 3 741 331,34 EUR, neattiecināmās izmaksas - 981 591,64 EUR.Projekta attiecināmo izmaksas dalījumā pa finanšu avotiem - pieprasītais ERAF līdzfinansējums: 3 180 131,64 EUR (ar atbalsta intensitāti – 85%), savukārt attiecināmais valsts budžeta finansējums – 561 199,70 EUR. Projekta ietvaros pēc energoefektivitātes paaugstināšanas pasākumu īstenošanas plānots sasniegt enerģijas samazinājumu visām trīs ēkām kopā par 1820,39 MWh / gadā, savukārt enerģijas patēriņš pēc projekta īstenošanas vidusskolas ēkas apkurei nepārsniegs 86,74 kWh/m2 gadā, vidusskolas 2.dienesta viesnīcas ēkai – 67,06 kWh/m2 un vidusskolas 3.dienesta viesnīcas ēkai – 68,28 kWh/m2.Aprēķinātais siltumnīcefekta gāzu samazinājums: 461,35 tonnas CO2/gadā (vidusskola ēkai – 302,82 tonnas CO2/gadā, vidusskolas 2.dienesta viesnīcas ēkai – 80,20 tonnas CO2/gadā un vidusskolas 3.dienesta viesnīcas ēkai – 78,33 tonnas CO2/gadā). (Latvian)
    0 references
    Limited liability company “Bulduru Secondary School of Gardening” (hereinafter – Company) is a structural unit of the Latvian University of Agriculture (capital company) under the Ministry of Agriculture, the main aim of which is to provide quality, competitive and European labour market vocational education and further education in gardening, landscape architecture, catering and hospitality services, as well as preparation for continuing education at a higher education level.The Society has organised its economic and administrative activities both historically and currently in the complex and adjacent territory of Viestura iela 6. The aim of this project is to implement energy efficiency-enhancing measures in the three buildings of the Bulduri Secondary School of Gardening, which are related to the improvement of building envelopes and engineering systems, thus significantly improving the technical condition of the buildings and at the same time substantially reducing the necessary energy consumption to ensure the thermal stability of buildings. Project eligible costs are planned to promote energy efficiency – insulation of building envelope structures, additional insulation of existing windows and door sections, as well as replacement of windows with new glass package windows, renovation of entrance nodes, renovation of heating system and heating unit, renewal of electrical supply system and distribution wiring, renovation of lighting system, ventilation and heating system renovation, cold and hot water and sewerage system renovation, lightning protection and heating system renovation, project supervision project implementation project implementation time as well as related construction costs. 33 months from the conclusion of the contract on project implementation, until October 31, 2022.Project total costs: EUR 4722922,98, of which project eligible costs EUR 3741331,34, ineligible costs – EUR 981591,64.The eligible costs of the project by financial sources – requested ERDF co-financing: Within the project, after the implementation of energy efficiency improvement measures, it is planned to achieve energy reduction for all three buildings totalling 1820.39 MWh/year, while energy consumption for heating the secondary school building will not exceed 86.74 kWh/m² per year after the implementation of the project, it is planned to achieve energy reduction for all three buildings in total for 1820.39 MWh/m², and energy consumption for the 3rd day building of the secondary school building will not exceed 86.74 kWh/m² per year, for the 2nd day hotel building in secondary school – 67.06 kWh/m² and for the 3rd day high school hotel building – 68.28 kWh/m². 461.35 tons CO2/year (for secondary school building – 302.82 tons CO2/year, secondary school for 2nd service hotel building – 80.20 tons CO2/year and secondary school 3rd service hotel building – 78.33 tonnes CO2/year). (English)
    15 July 2021
    0 references
    Viestura iela 6, Jūrmala, LV-2010
    0 references

    Identifiers

    4.2.1.2/19/I/003
    0 references