Development of an environment conducive to the development of entrepreneurship at Viestura Street (Q3056799): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The aim of the project is to increase the amount of private investment in Cesis Clinic (Slimnīcas street 9, Cēsis, Cesis, novads) by investing in restoration of Cēsis clinic access streets, namely, Viesturs and Satekles street sections, in accordance with the economic specialisation of the territories defined in the municipal development programme and based on the needs of merchants. On Viesturs and Satekles Street, maintaining the existing para...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Development of an environment conducive to the development of entrepreneurship at Viestura Street

Revision as of 12:38, 15 July 2021

Project Q3056799 in Latvia
Language Label Description Also known as
English
Development of an environment conducive to the development of entrepreneurship at Viestura Street
Project Q3056799 in Latvia

    Statements

    0 references
    0 references
    28,409.75 Euro
    0 references
    171,372.21 Euro
    0 references
    12 August 2020
    0 references
    11 January 2021
    0 references
    Cēsu novada pašvaldība
    0 references
    0 references

    57°19'6.28"N, 25°15'28.84"E
    0 references
    Projekta mērķis ir palielināt privāto investīciju apjomu Cēsu klīnikas (Slimnīcas iela 9, Cēsis, Cēsu novads) rajonā, veicot ieguldījumus Cēsu klīnikas piekļuves ielu, konkrēti, Viestura un Satekles ielu posmu atjaunošanā, atbilstoši pašvaldības attīstības programmā noteiktajai teritoriju ekonomiskajai specializācijai un balstoties uz komersantu vajadzībām.Galvenās darbības: Viestura un Satekles ielā, saglabājot esošos ielas un ietves parametrus un izstrādājot apliecinājuma karti, paredzēta ielas braucamās daļas asfaltbetona segas atjaunošana 525 m garumā reciklējot esošo asfaltbetona segumu un izbūvējot 2 jaunas asfaltbetona kārtas, vienlaicīgi atjaunojot arī ielas apmales un esošās ietves, kā arī aku, gūliju sakārtošana un horizontālā marķējuma uzklāšana. Rekonstruējot ielu posmus, paredzams, ka tiks veicināta gājēju kustība, tiks nodrošināta pārvietošanās cilvēkiem ar kustību traucējumiem un vecākiem ar bērnu ratiņiem nokļūšana līdz SIA "Cēsu klīnika" ēkai, jo tiks atjaunotas līdzenas ietves, nodrošinot lēzena augstuma līmeņa maiņa ar brauktuvi. Rekonstruējot ielu posmus, paredzams, ka tiks veicināta velosatiksme, tiks nodrošināta ērtāka piekļuve ar automašīnām, kā arī pilsētas vide tiks padarīta vizuāli pievilcīgāka, kopumā nodrošinot lielāku cilvēku plūsmu uz SIA "Cēsu klīnika" ēkā esošiem medicīniska rakstura pakalpojumiem, veicinot nākotnē plašāku pakalpojumu pieejamību.Projekta ieviešanas rezultātā uzlabosies uzņēmējdarbības vide. Rezultatīvo rādītāju nodrošinās 3 uzņēmumi, kas izveidos vismaz 1 darba vietu un ieguldīs nefinanšu investīcijas pašu nemateriālajos ieguldījumos un pamatlīdzekļos vismaz 26 000 EUR apjomā. Projekta paredzētais īstenošanas laiks plānots sākot no vienošanās par projekta īstenošanu noslēgšanas 2020.gada augustā līdz 2020.gada 31.decembrim (kopā – 5 mēneši). Kopējās projekta izmaksas ir paredzētas 171 522,21 EUR apjomā, tai skaitā 28434,62 EUR ir ERAF līdzfinansējums. (Latvian)
    0 references
    The aim of the project is to increase the amount of private investment in Cesis Clinic (Slimnīcas street 9, Cēsis, Cesis, novads) by investing in restoration of Cēsis clinic access streets, namely, Viesturs and Satekles street sections, in accordance with the economic specialisation of the territories defined in the municipal development programme and based on the needs of merchants. On Viesturs and Satekles Street, maintaining the existing parameters of street and sidewalk and developing the certificate card, it is planned to renew the road section asphalt concrete pavement for 525 m by reciprocating the existing asphalt concrete covering and constructing 2 new layers of asphalt concrete, at the same time restoring the street border and the existing sidewalks, as well as the arrangement of wells, hippies and horizontal markings. When reconstructing street sections, it is expected that pedestrian movement will be facilitated, mobility for people with reduced mobility and parents with baby carriages get to SIA “Cēsu klīnika” building, as flat sidewalks will be restored, ensuring a change of flat height level by the carriageway. By reconstructing the street sections, it is expected that cycling will be promoted, more convenient access by cars will be provided, as well as the city environment will be made visually more attractive, providing in general a greater flow of people to medical services existing in the building of SIA “Cēsu klīnika”, promoting wider availability of services in the future. The performance indicator will be provided by 3 companies that will create at least 1 jobs and invest at least EUR 26000 in non-financial investments in their own intangible and fixed assets. The planned implementation period of the project is planned from the conclusion of the agreement on the implementation of the project in August 2020 until December 31, 2020 (in total – 5 months). The total cost of the project is estimated at EUR 171522,21, including EUR 28434,62 is ERDF co-financing. (English)
    15 July 2021
    0 references
    Viestura iela, Cēsis, Cēsu nov.
    0 references
    Satekles iela, Cēsis, Cēsu nov.
    0 references

    Identifiers

    3.3.1.0/20/I/014
    0 references