Fiber expansion in Dalarna 2020-2023 (ERUF5) (Q2661172): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Changed an Item)
Property / instance of
 
Property / instance of: Kohesio project / rank
 
Normal rank

Revision as of 12:13, 9 July 2021

No description defined
Language Label Description Also known as
English
Fiber expansion in Dalarna 2020-2023 (ERUF5)
No description defined

    Statements

    0 references
    0 references
    0 references
    2,474,000.0 Swedish krona
    0 references
    244,926.0 Euro
    28 April 2021
    0 references
    3,758,000.0 Swedish krona
    0 references
    372,042.0 Euro
    28 April 2021
    0 references
    66.0 percent
    0 references
    66.0 percent
    0 references
    6 May 2020
    0 references
    30 April 2023
    0 references
    REGION DALARNA
    0 references
    0 references
    79129
    0 references
    Skäl Förutsättningarna för att såväl driva företag som att bo och verka i ett antal områden i Dalarna påverkas negativt av att det saknas tillgång till bredband med hög överföringshastighet. Orsak Det saknas marknadsmässiga incitament för att bygga fiber i de aktuella områdena. Orsakerna till detta kan variera från fall till fall. Centralt är dock att kostnaden är för hög i relation till den beräknade intäkten. En typisk förklaring är att antalet potentiella kunder i området är för litet för att en nätägare att engagera sig på rent marknadsmässiga villkor. Övergripande mål: att stärka förutsättningarna för att driva och utveckla SMF inom utpekade områden där det idag saknas tillgång till fiber. Projektmål: att bidra till utbyggnad av fiber fram till områden där företag idag inte har tillgång till detta. Delmål: I ERUF5 5 byggs ortsammanbindande fibernät till 5 områden där företag idag saknar fiber. Förväntat resultat vid projektavslut Utifrån analys av de områden som ingår i projektet och SCB-uppgifter om förekomst av arbetsställen beräknas att projektet rör 57 arbetsställen. Det förväntade resultatet efter projektets genomförande är att dessa områden nås av ortssammanbindande fiber. I förlängningen samverkar detta med utbyggnad av accessnät (områdesnät) så att slutresultatet blir konkret möjlighet för SME att köpa fiberbaserade tjänster på sitt verksamhetsställe. (Swedish)
    0 references
    Reasons The prerequisites for running a company as well as living and operating in a number of areas in Dalarna are adversely affected by the lack of access to broadband with high transmission speed. Cause There is no market incentive for building fibre in the relevant areas. The reasons for this can vary from case to case. Central, however, is that the cost is too high in relation to the estimated revenue. A typical explanation is that the number of potential customers in the area is too small for a network owner to engage on purely market terms. Overall objectives: to strengthen the conditions for driving and developing SMEs in designated areas where there is currently no access to fibre. Project objectives: to contribute to the expansion of fibre up to areas where companies currently do not have access to this. Sub-targets: In ERUF5 5, localised fibre networks are built to 5 areas where companies currently lack fibre. Expected project results Based on analysis of the areas included in the project and SCB data on the occurrence of establishments, it is estimated that the project relates to 57 establishments. The expected result after the project is that these areas are reached by localised fibres. In the long run, this interacts with the expansion of access networks (area networks) so that the end result becomes concrete opportunity for SME to purchase fibre-based services at its establishment. (English)
    29 April 2021
    0 references

    Identifiers

    20265404
    0 references