Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana) (Q2982936): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption., translated_summary) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q2996055 / rank | |||
Normal rank |
Revision as of 08:54, 9 July 2021
Project Q2982936 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana) |
Project Q2982936 in Portugal |
Statements
521,867.39 Euro
0 references
85.0 percent
0 references
5 November 2019
0 references
28 February 2021
0 references
A.R.M. - ÁGUAS E RESÍDUOS DA MADEIRA, S.A.
0 references
A Operação visa correção de situações operacionais identificadas (falhas abastecimento), que consistem, na substituição de troços de redes subdimensionados, nos quais se registam pressões desajustadas, caudal reduzido. A construção de 2 EE permitirá o aumento da capacidade de distribuição, solucionar as faltas de pressão no abastecimento naquelas zonas, uma vez que a rede implementada se revela insuficiente para satisfazer os consumos. (Portuguese)
0 references
The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption. (English)
9 July 2021
0 references
Identifiers
POSEUR-03-2012-FC-001421
0 references