Loss Control in the Water Supply System of the Municipality of Vale de Cambra (Q2982932): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): It aims to control and reduce losses in water distribution and supply systems, including equipment for leakage detection campaigns, acquisition and installation of control and measurement and tele-management equipment., translated_summary) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Vale de Cambra / rank | |||
Normal rank |
Revision as of 08:54, 9 July 2021
Project Q2982932 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Loss Control in the Water Supply System of the Municipality of Vale de Cambra |
Project Q2982932 in Portugal |
Statements
114,626.2 Euro
0 references
85.0 percent
0 references
27 June 2019
0 references
30 December 2020
0 references
MUNICÍPIO DE VALE DE CAMBRA
0 references
Tem em vista o controlo e a redução de perdas nos sistemas de distribuição e adução de água, designadamente em equipamentos para campanhas de deteção de fugas, aquisição e instalação de equipamentos de controlo e medição e telegestão. (Portuguese)
0 references
It aims to control and reduce losses in water distribution and supply systems, including equipment for leakage detection campaigns, acquisition and installation of control and measurement and tele-management equipment. (English)
9 July 2021
0 references
Vale de Cambra
0 references
Identifiers
POSEUR-03-2012-FC-001417
0 references