Energy Efficiency in Building D of the College of Lions (Leoes-D) (Q2981176): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The following improvement measures were considered: Thermal insulation placement in the roofs, gutters and some walls and replacement of existing lamps by LED., translated_summary) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Q2985737 (Deleted Item) | |||
Property / beneficiary: Q2985737 (Deleted Item) / rank | |||
Normal rank |
Revision as of 08:47, 9 July 2021
Project Q2981176 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy Efficiency in Building D of the College of Lions (Leoes-D) |
Project Q2981176 in Portugal |
Statements
180,133.12 Euro
0 references
85.0 percent
0 references
1 September 2017
0 references
31 May 2021
0 references
UNIVERSIDADE DE ÉVORA
0 references
Q2985737 (Deleted Item)
0 references
Foram consideradas as seguintes medidas de melhoria: colocação de isolamento térmico nas coberturas, caleiras e algumas paredes e substituição das lâmpadas existentes por LED. (Portuguese)
0 references
The following improvement measures were considered: Thermal insulation placement in the roofs, gutters and some walls and replacement of existing lamps by LED. (English)
9 July 2021
0 references
Évora, União das freguesias de Bacelo e Senhora da Saúde
0 references
Identifiers
POSEUR-01-1203-FC-000053
0 references