ETA da Ribeira Brava Expanding the Treatment Capacity (Q2982534): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection, translat...)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q2996055 / rank
 
Normal rank

Revision as of 08:36, 9 July 2021

Project Q2982534 in Portugal
Language Label Description Also known as
English
ETA da Ribeira Brava Expanding the Treatment Capacity
Project Q2982534 in Portugal

    Statements

    0 references
    0 references
    1,292,742.2 Euro
    0 references
    85.0 percent
    0 references
    30 April 2014
    0 references
    31 July 2020
    0 references
    A.R.M. - ÁGUAS E RESÍDUOS DA MADEIRA, S.A.
    0 references
    0 references
    0 references

    32°40'12.32"N, 17°3'54.14"W
    0 references
    As intervenções da Operação, sumariamente, são as seguintes:i. Construção de uma nova linha de tratamento bem como de um sistema de desinfeção por ultravioletas para as duas linhas ii. Monitorização, medição e regulação dos caudais das diversas origens e fases do sistema iii. Modernização do sistema de controlo e sua interligação com o sistema de Telegestão iv). Construção de uma nova adutora, mantendo a ligação existente (Portuguese)
    0 references
    The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection (English)
    9 July 2021
    0 references
    Ribeira Brava
    0 references

    Identifiers

    POSEUR-03-2012-FC-000766
    0 references