Valada sewage treatment plant (Q2981990): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system., tra...)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3055081 / rank
 
Normal rank

Revision as of 08:36, 9 July 2021

Project Q2981990 in Portugal
Language Label Description Also known as
English
Valada sewage treatment plant
Project Q2981990 in Portugal

    Statements

    0 references
    2,144,385.29 Euro
    0 references
    85.0 percent
    0 references
    29 January 2016
    0 references
    31 May 2020
    0 references
    CARTÁGUA - ÁGUAS DO CARTAXO, S.A.
    0 references
    0 references
    0 references

    39°9'42.91"N, 8°47'10.46"W
    0 references
    Remodelação da ETAR de Valada e construção do sistema intercetor. O sistema intercetor compõe-se de 3 setores, cada um deles composto por uma estação elevatória e uma conduta elevatória. A ETAR existente permite atualmente o tratamento de águas residuais de 1,3% da população do município do Cartaxo. Graças a esta intervenção, 12,5% da população do Cartaxo passará a ter acesso a um sistema de saneamento adequado. (Portuguese)
    0 references
    Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system. (English)
    9 July 2021
    0 references
    Cartaxo
    0 references

    Identifiers

    POSEUR-03-2012-FC-000011
    0 references