Public Drainage of Waste Waters of Folgosinho (Q2982622): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The present project refers to the closure of the SAR network in the village of Folgosinho. The recommended technical solutions involve: (i) Construction of lift station (ii) Construction of pressure operating emissary (iii) Lifting of the existing sidewalk and its replacement. In terms of population in the area of influence of the project, the project contributes to the addition of 70 people connected to the SAR system., translated_summary)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Q2991041 (Deleted Item)
Property / beneficiary: Q2991041 (Deleted Item) / rank
 
Normal rank

Revision as of 08:28, 9 July 2021

Project Q2982622 in Portugal
Language Label Description Also known as
English
Public Drainage of Waste Waters of Folgosinho
Project Q2982622 in Portugal

    Statements

    0 references
    35,459.67 Euro
    0 references
    85.0 percent
    0 references
    31 July 2017
    0 references
    30 October 2020
    0 references
    MUNICÍPIO DE GOUVEIA
    0 references
    Q2991041 (Deleted Item)
    0 references
    0 references

    40°30'38.20"N, 7°30'48.38"W
    0 references
    O presente projeto refere-se ao fecho da rede de SAR na povoação de Folgosinho. As soluções técnicas preconizadas envolvem a: (i) Construção de estação elevatória (ii) Construção de emissário de funcionamento em pressão (iii) Levantamento da calçada existente e sua reposição. Em termos populacionais na área de influência do projeto, o projeto contribui para o acréscimo de 70 pessoas ligados ao sistema de SAR. (Portuguese)
    0 references
    The present project refers to the closure of the SAR network in the village of Folgosinho. The recommended technical solutions involve: (i) Construction of lift station (ii) Construction of pressure operating emissary (iii) Lifting of the existing sidewalk and its replacement. In terms of population in the area of influence of the project, the project contributes to the addition of 70 people connected to the SAR system. (English)
    9 July 2021
    0 references
    Gouveia, Folgosinho
    0 references

    Identifiers

    POSEUR-03-2012-FC-000994
    0 references