Elaboration of records of existing infrastructures in the water supply systems in the municipality of Pombal (Q2982074): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operation consists of drawing up the register of low water supply infrastructures in the municipality of Pombal, to be implemented within a period of 2 years after approval of the application, with a view to improving infrastructure management, but also improving the index of infrastructural knowledge of water supply, in order to achieve an increase in the index score in the order of 43 points, including low density zones., translated_summary)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Q2990897 (Deleted Item)
Property / beneficiary: Q2990897 (Deleted Item) / rank
 
Normal rank

Revision as of 08:26, 9 July 2021

Project Q2982074 in Portugal
Language Label Description Also known as
English
Elaboration of records of existing infrastructures in the water supply systems in the municipality of Pombal
Project Q2982074 in Portugal

    Statements

    0 references
    352,758.51 Euro
    0 references
    85.0 percent
    0 references
    1 March 2016
    0 references
    31 March 2020
    0 references
    MUNICÍPIO DE POMBAL
    0 references
    Q2990897 (Deleted Item)
    0 references
    0 references

    39°54'58.28"N, 8°37'40.51"W
    0 references
    A operação consiste na elaboração do cadastro das infraestruturas de abastecimento de água em baixa, no concelho de Pombal, a executar num período de 2 anos após aprovação da candidatura, tendo em vista a melhoria da gestão de infraestruturas, mas também a melhoria do “índice de conhecimento infraestrutural de abastecimento de água”, visando alcançar um acréscimo na pontuação do índice na ordem dos 43 pontos, incluindo zona de baixa densidade. (Portuguese)
    0 references
    The operation consists of drawing up the register of low water supply infrastructures in the municipality of Pombal, to be implemented within a period of 2 years after approval of the application, with a view to improving infrastructure management, but also improving the index of infrastructural knowledge of water supply, in order to achieve an increase in the index score in the order of 43 points, including low density zones. (English)
    9 July 2021
    0 references
    Pombal
    0 references

    Identifiers

    POSEUR-03-2012-FC-000102
    0 references