Redevelopment of the Santana Sanitation Subsystem – connection from Monte do Pardo to the Arneiro Water Treatment Plant (Q2982813): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operation aims at the construction of a lifting station and 2,951 m of emissary to connect the domestic waste water from the town of Monte do Pardo to the Monte do Arneiro treatment plant.The town of Monte do Pardo has a network of drainage of waste water through a network of gravitic collectors in ceramic stoneware with about 1,000 m of extension that drain to the septic tank of the system., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Redevelopment of the Santana Sanitation Subsystem – connection from Monte do Pardo to the Arneiro Water Treatment Plant

Revision as of 02:14, 9 July 2021

Project Q2982813 in Portugal
Language Label Description Also known as
English
Redevelopment of the Santana Sanitation Subsystem – connection from Monte do Pardo to the Arneiro Water Treatment Plant
Project Q2982813 in Portugal

    Statements

    0 references
    269,990.6 Euro
    0 references
    85.0 percent
    0 references
    1 January 2020
    0 references
    31 December 2020
    0 references
    ÁGUAS DO ALTO ALENTEJO, E.I.M., S.A.
    0 references
    0 references

    39°36'44.24"N, 7°41'39.44"W
    0 references
    A operação visa a construção de uma estação elevatória e 2.951m de emissário para ligação das águas residuais domésticas da localidade de Monte do Pardo à ETAR do Monte do Arneiro.A localidade de Monte do Pardo possui rede de drenagem de águas residuais através de uma rede de coletores gravíticos em grés cerâmico com cerca de 1.000m de extensão que drenam para a fossa séptica do sistema. (Portuguese)
    0 references
    The operation aims at the construction of a lifting station and 2,951 m of emissary to connect the domestic waste water from the town of Monte do Pardo to the Monte do Arneiro treatment plant.The town of Monte do Pardo has a network of drainage of waste water through a network of gravitic collectors in ceramic stoneware with about 1,000 m of extension that drain to the septic tank of the system. (English)
    9 July 2021
    0 references
    Nisa, Santana
    0 references

    Identifiers

    POSEUR-03-2012-FC-001246
    0 references