DRAINAGE NETWORK OF OLIVEIRA DE AZEMÉIS-FAJÕES AND MADAÍL (Q2982957): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %., remove_old_english_translation)
(‎Created claim: summary (P836): The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %., translated_summary)
Property / summary
 
The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %. (English)
Property / summary: The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %. (English) / rank
 
Normal rank
Property / summary: The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:13, 9 July 2021

Project Q2982957 in Portugal
Language Label Description Also known as
English
DRAINAGE NETWORK OF OLIVEIRA DE AZEMÉIS-FAJÕES AND MADAÍL
Project Q2982957 in Portugal

    Statements

    0 references
    1,357,642.89 Euro
    0 references
    85.0 percent
    0 references
    30 June 2021
    0 references
    29 June 2023
    0 references
    MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
    0 references
    0 references

    40°50'20.44"N, 8°28'40.01"W
    0 references
    A operação visa o prolongamento da rede de drenagem de águas residuais a populações ainda não servidas em determinadas zonas de intervenção do Município de Oliveira de Azeméis, nomeadamente, Fajões, Oliveira de Azeméis, Santiago de Riba-Ul e Madail. A concretização da operação permitirá chegar a mais 2 883 habitantes o que se traduz num aumento de taxa de cobertura na ordem dos 4,07%. (Portuguese)
    0 references
    The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %. (English)
    9 July 2021
    0 references
    Oliveira de Azeméis
    0 references

    Identifiers

    POSEUR-03-2012-FC-001453
    0 references