Reduction of water losses in OA systems in the municipality of Melgaço. (Q2982923): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council., remove_old_english_translation)
Property / summary
Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council. (English)
 
Property / summary: Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council. (English) / rank
Normal rank
 
Property / summary: Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 02:13, 9 July 2021

Project Q2982923 in Portugal
Language Label Description Also known as
English
Reduction of water losses in OA systems in the municipality of Melgaço.
Project Q2982923 in Portugal

    Statements

    0 references
    221,055.33 Euro
    0 references
    85.0 percent
    0 references
    9 March 2019
    0 references
    31 August 2021
    0 references
    MUNICÍPIO DE MELGAÇO
    0 references
    0 references

    42°6'46.48"N, 8°15'29.05"W
    0 references
    Aumento do controlo sobre a rede a atuar para a redução de perdas nos sistemas em baixa de abastecimento de água que se encontram sob gestão do Município de Melgaço. (Portuguese)
    0 references
    Melgaço
    0 references

    Identifiers

    POSEUR-03-2012-FC-001400
    0 references