Reduction of water losses in OA systems in the municipality of Melgaço. (Q2982923): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Removed claim: summary (P836): Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council., remove_old_english_translation) |
||||||||||||||
Property / summary | |||||||||||||||
Property / summary: Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council. (English) / rank | |||||||||||||||
Property / summary: Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council. (English) / qualifier | |||||||||||||||
|
Revision as of 02:13, 9 July 2021
Project Q2982923 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of water losses in OA systems in the municipality of Melgaço. |
Project Q2982923 in Portugal |
Statements
221,055.33 Euro
0 references
85.0 percent
0 references
9 March 2019
0 references
31 August 2021
0 references
MUNICÍPIO DE MELGAÇO
0 references
Aumento do controlo sobre a rede a atuar para a redução de perdas nos sistemas em baixa de abastecimento de água que se encontram sob gestão do Município de Melgaço. (Portuguese)
0 references
Melgaço
0 references
Identifiers
POSEUR-03-2012-FC-001400
0 references