Interventions in the Drainage Network of Wastewater in Baixa in the municipality of Baião (SAR Gove) (Q2982674): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The operation aims to close down drainage systems in the municipality of Baião, with a view to optimising the installed capacity in the SAR Gove and the extension of the service to about 140 inhabitants/72 housings, through the construction of 3.09 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 286,438.35., remove_old_english_translation) |
(Created claim: summary (P836): The operation aims to close down drainage systems in the municipality of Baião, with a view to optimising the installed capacity in the SAR Gove and the extension of the service to about 140 inhabitants/72 housings, through the construction of 3.09 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 286,438.35., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The operation aims to close down drainage systems in the municipality of Baião, with a view to optimising the installed capacity in the SAR Gove and the extension of the service to about 140 inhabitants/72 housings, through the construction of 3.09 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 286,438.35. (English) | |||||||||||||||
Property / summary: The operation aims to close down drainage systems in the municipality of Baião, with a view to optimising the installed capacity in the SAR Gove and the extension of the service to about 140 inhabitants/72 housings, through the construction of 3.09 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 286,438.35. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation aims to close down drainage systems in the municipality of Baião, with a view to optimising the installed capacity in the SAR Gove and the extension of the service to about 140 inhabitants/72 housings, through the construction of 3.09 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 286,438.35. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 02:11, 9 July 2021
Project Q2982674 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Interventions in the Drainage Network of Wastewater in Baixa in the municipality of Baião (SAR Gove) |
Project Q2982674 in Portugal |
Statements
221,691.47 Euro
0 references
85.0 percent
0 references
27 October 2017
0 references
5 March 2021
0 references
ÁGUAS DO NORTE, S.A.
0 references
A operação visa o fecho de sistemas de drenagem em baixa no Município de Baião, com vista à otimização da capacidade instalada no SAR Gove e da extensão do serviço a cerca de 140 habitantes/72 alojamentos, através da construção de 3,09 km de rede de drenagem de águas residuais e uma estação elevatória de águas residuais. O investimento elegível previsto no âmbito da Operação é de 286.438,35. (Portuguese)
0 references
The operation aims to close down drainage systems in the municipality of Baião, with a view to optimising the installed capacity in the SAR Gove and the extension of the service to about 140 inhabitants/72 housings, through the construction of 3.09 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 286,438.35. (English)
9 July 2021
0 references
Baião
0 references
Identifiers
POSEUR-03-2012-FC-001071
0 references