Interventions in the Water Supply Network in Baixa in the municipality of Baião (SA AA Gestaçô) (Q2982664): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43., remove_old_e...)
(‎Created claim: summary (P836): This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43., translated_sum...)
Property / summary
 
This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43. (English)
Property / summary: This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43. (English) / rank
 
Normal rank
Property / summary: This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:11, 9 July 2021

Project Q2982664 in Portugal
Language Label Description Also known as
English
Interventions in the Water Supply Network in Baixa in the municipality of Baião (SA AA Gestaçô)
Project Q2982664 in Portugal

    Statements

    0 references
    217,164.22 Euro
    0 references
    85.0 percent
    0 references
    15 March 2017
    0 references
    31 December 2019
    0 references
    ÁGUAS DO NORTE, S.A.
    0 references
    0 references

    41°10'9.52"N, 7°58'38.28"W
    0 references
    Esta operação visa o fecho dos sistemas de abastecimentos de água em baixa no Município de Baião, com vista à extensão do serviço de AA a cerca de 138 habitantes/107 alojamentos das freguesias de Santa Marinha do Zêzere (lugar de Fonseca) e Tresouras (lugar de Calvos), através da construção das seguintes infraestruturas no SA AA Gestaçô: 6,3km de Rede AA e 107 Ramais de AA.O Investimento elegível da Operação é de 306.009,43€. (Portuguese)
    0 references
    This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43. (English)
    9 July 2021
    0 references
    Baião
    0 references

    Identifiers

    POSEUR-03-2012-FC-001055
    0 references