Works at the Water Treatment Station of the Foundation (Q2982602): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The operation consists of an intervention to replace three existing treatment points, inefficient and with operational risks, by only one sewage treatment plant, and adaptation of the sanitation network, in order to achieve greater optimisation of resources, ensuring the quality of the service provided to the populations and the sustainability of the systems in the urban water treatment, maximising compliance with the regulations., remove_old_...)
Property / summary
The operation consists of an intervention to replace three existing treatment points, inefficient and with operational risks, by only one sewage treatment plant, and adaptation of the sanitation network, in order to achieve greater optimisation of resources, ensuring the quality of the service provided to the populations and the sustainability of the systems in the urban water treatment, maximising compliance with the regulations. (English)
 
Property / summary: The operation consists of an intervention to replace three existing treatment points, inefficient and with operational risks, by only one sewage treatment plant, and adaptation of the sanitation network, in order to achieve greater optimisation of resources, ensuring the quality of the service provided to the populations and the sustainability of the systems in the urban water treatment, maximising compliance with the regulations. (English) / rank
Normal rank
 
Property / summary: The operation consists of an intervention to replace three existing treatment points, inefficient and with operational risks, by only one sewage treatment plant, and adaptation of the sanitation network, in order to achieve greater optimisation of resources, ensuring the quality of the service provided to the populations and the sustainability of the systems in the urban water treatment, maximising compliance with the regulations. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 02:08, 9 July 2021

Project Q2982602 in Portugal
Language Label Description Also known as
English
Works at the Water Treatment Station of the Foundation
Project Q2982602 in Portugal

    Statements

    0 references
    1,315,701.91 Euro
    0 references
    85.0 percent
    0 references
    1 March 2018
    0 references
    31 January 2021
    0 references
    MUNICÍPIO DE VILA DE REI
    0 references
    0 references

    39°43'18.08"N, 8°8'40.38"W
    0 references
    A operação consubstancia-se numa intervenção de substituição de três pontos de tratamento existentes, ineficientes e com riscos de funcionamento, por apenas uma ETAR, e adaptação da rede de saneamento, no sentido de alcançar uma maior otimização dos recursos, garantindo a qualidade do serviço prestado às populações e a sustentabilidade dos sistemas no âmbito do tratamento de águas urbanas, maximizando o cumprimento dos normativos. (Portuguese)
    0 references
    Vila de Rei, Fundada
    0 references

    Identifiers

    POSEUR-03-2012-FC-000883
    0 references