Works at the Water Treatment Station of S João do Peso (Q2982579): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Removed claim: summary (P836): This operation is designed to meet the detected need for recasting of existing equipment, consisting of the replacement of two existing plants with only one sewage plant, with a view to reducing the associated costs, maximising the resources available and complying with the discharge parameters in order to contribute to the reduction of pollution of water bodies., remove_old_english_translation) |
||||||||||||||
Property / summary | |||||||||||||||
Property / summary: This operation is designed to meet the detected need for recasting of existing equipment, consisting of the replacement of two existing plants with only one sewage plant, with a view to reducing the associated costs, maximising the resources available and complying with the discharge parameters in order to contribute to the reduction of pollution of water bodies. (English) / rank | |||||||||||||||
Property / summary: This operation is designed to meet the detected need for recasting of existing equipment, consisting of the replacement of two existing plants with only one sewage plant, with a view to reducing the associated costs, maximising the resources available and complying with the discharge parameters in order to contribute to the reduction of pollution of water bodies. (English) / qualifier | |||||||||||||||
|
Revision as of 02:08, 9 July 2021
Project Q2982579 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Works at the Water Treatment Station of S João do Peso |
Project Q2982579 in Portugal |
Statements
212,997.65 Euro
0 references
85.0 percent
0 references
1 March 2018
0 references
29 May 2020
0 references
MUNICÍPIO DE VILA DE REI
0 references
Esta operação surge no sentido de dar resposta à necessidade detetada de reformulação dos equipamentos existentes, consistindo na substituição de duas unidades existentes por apenas uma ETAR, visando reduzir os custos que lhes estão associados, maximizar os recursos disponibilizados e cumprir os parâmetros de descarga, a fim de concorrer para a diminuição da poluição das massas de água. (Portuguese)
0 references
Vila de Rei, São João do Peso
0 references
Identifiers
POSEUR-03-2012-FC-000829
0 references