Reduction of water losses in OA systems in the municipality of Melgaço. (Q2982923): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Reduction of water losses in OA systems in the municipality of Melgaço.

Revision as of 02:05, 9 July 2021

Project Q2982923 in Portugal
Language Label Description Also known as
English
Reduction of water losses in OA systems in the municipality of Melgaço.
Project Q2982923 in Portugal

    Statements

    0 references
    221,055.33 Euro
    0 references
    85.0 percent
    0 references
    9 March 2019
    0 references
    31 August 2021
    0 references
    MUNICÍPIO DE MELGAÇO
    0 references
    0 references

    42°6'46.48"N, 8°15'29.05"W
    0 references
    Aumento do controlo sobre a rede a atuar para a redução de perdas nos sistemas em baixa de abastecimento de água que se encontram sob gestão do Município de Melgaço. (Portuguese)
    0 references
    Increased control over the network to be taken to reduce losses in low water supply systems under the management of the Melgaço Council. (English)
    9 July 2021
    0 references
    Melgaço
    0 references

    Identifiers

    POSEUR-03-2012-FC-001400
    0 references