Remodeling of the Murteira sewage treatment plant (Q2982237): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The operation consists of increasing the treatment capacity of Murteira’s sewage treatment plant to compensate for the new requests of the subsystem, with the introduction of a new phase of biological treatment (MBR technology) and interventions in the preliminary phase. Failure to implement the investment will in the short term call into question compliance with Community and national legislation, in particular Daru (Directive 91/271/EEC of 2...) |
(Created claim: summary (P836): The operation consists of increasing the treatment capacity of Murteira’s sewage treatment plant to compensate for the new requests of the subsystem, with the introduction of a new phase of biological treatment (MBR technology) and interventions in the preliminary phase. Failure to implement the investment will in the short term call into question compliance with Community and national legislation, in particular Daru (Directive 91/271/EEC of 21...) |
||||||||||||||
Property / summary | |||||||||||||||
The operation consists of increasing the treatment capacity of Murteira’s sewage treatment plant to compensate for the new requests of the subsystem, with the introduction of a new phase of biological treatment (MBR technology) and interventions in the preliminary phase. Failure to implement the investment will in the short term call into question compliance with Community and national legislation, in particular Daru (Directive 91/271/EEC of 21 May). (English) | |||||||||||||||
Property / summary: The operation consists of increasing the treatment capacity of Murteira’s sewage treatment plant to compensate for the new requests of the subsystem, with the introduction of a new phase of biological treatment (MBR technology) and interventions in the preliminary phase. Failure to implement the investment will in the short term call into question compliance with Community and national legislation, in particular Daru (Directive 91/271/EEC of 21 May). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation consists of increasing the treatment capacity of Murteira’s sewage treatment plant to compensate for the new requests of the subsystem, with the introduction of a new phase of biological treatment (MBR technology) and interventions in the preliminary phase. Failure to implement the investment will in the short term call into question compliance with Community and national legislation, in particular Daru (Directive 91/271/EEC of 21 May). (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:56, 9 July 2021
Project Q2982237 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Remodeling of the Murteira sewage treatment plant |
Project Q2982237 in Portugal |
Statements
569,041.01 Euro
0 references
85.0 percent
0 references
1 July 2014
0 references
31 December 2020
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
A operação consiste no aumento da capacidade de tratamento da ETAR da Murteira, de modo a compensar as novas solicitações do subsistema, com a introdução de uma nova fase de tratamento biológico (tecnologia MBR) e de intervenções na fase preliminar. A não concretização do investimento porá em causa, a curto prazo, o cumprimento de legislação comunitária e nacional, nomeadamente a DARU (Diretiva 91 /271 /CEE, de 21 de maio). (Portuguese)
0 references
The operation consists of increasing the treatment capacity of Murteira’s sewage treatment plant to compensate for the new requests of the subsystem, with the introduction of a new phase of biological treatment (MBR technology) and interventions in the preliminary phase. Failure to implement the investment will in the short term call into question compliance with Community and national legislation, in particular Daru (Directive 91/271/EEC of 21 May). (English)
9 July 2021
0 references
Benavente, Samora Correia
0 references
Identifiers
POSEUR-03-2012-FC-000332
0 references