Extension of the Wastewater Sanitation Network of the municipality of Cantanhede Ançã Subsystem (Q2982150): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body)., remove_old_english_translation)
(‎Created claim: summary (P836): The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body)., translated_summary)
Property / summary
 
The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body). (English)
Property / summary: The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body). (English) / rank
 
Normal rank
Property / summary: The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body). (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:54, 9 July 2021

Project Q2982150 in Portugal
Language Label Description Also known as
English
Extension of the Wastewater Sanitation Network of the municipality of Cantanhede Ançã Subsystem
Project Q2982150 in Portugal

    Statements

    0 references
    68,883.16 Euro
    0 references
    85.0 percent
    0 references
    1 June 2016
    0 references
    31 December 2019
    0 references
    INOVA - EMPRESA DE DESENVOLVIMENTO ECONÓMICO E SOCIAL DE CANTANHEDE, EM - S.A.
    0 references
    0 references

    40°21'55.76"N, 8°39'29.95"W
    0 references
    A solução de conceção da operação, compreende a construção de redes coletoras numa extensão de 0,94 km e 8 ramais domiciliários de esgoto, prevendo-se que sirva 20 habitantes (população residente), com um custo total de investimento de 81.039,01 €uros (não inclui o IVA às taxas legais em vigor, já que é recuperável pela entidade gestora). (Portuguese)
    0 references
    The solution for designing the operation includes the construction of collecting networks over an extension of 0.94 km and 8 sewage branches, and it is expected to serve 20 inhabitants (resident population), with a total investment cost of 81,039.01 EURuros (not including VAT at the legal rates in force, since it is recoverable by the managing body). (English)
    9 July 2021
    0 references
    Cantanhede
    0 references

    Identifiers

    POSEUR-03-2012-FC-000211
    0 references