Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant (Q2982019): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies., remove_old_english_translation)
Property / summary
It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English)
 
Property / summary: It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English) / rank
Normal rank
 
Property / summary: It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 01:51, 9 July 2021

Project Q2982019 in Portugal
Language Label Description Also known as
English
Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant
Project Q2982019 in Portugal

    Statements

    0 references
    196,854.22 Euro
    0 references
    85.0 percent
    0 references
    30 June 2016
    0 references
    21 April 2017
    0 references
    AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
    0 references
    0 references

    39°15'35.78"N, 8°35'4.24"W
    0 references
    Pretende-se implementar uma operação de pré-tratamento do efluente e ainda a instalação de um sistema de dosagem de ácido clorídrico diluído na superfície da lagoa de maturação, de modo a evitar a proliferação de algas. A operação garante assim um adequado tratamento dos efluentes recolhidos para uma população de 25006 habitantes servidos e contribui para a melhoria da qualidade das massas de água. (Portuguese)
    0 references
    Alpiarça, Alpiarça
    0 references

    Identifiers

    POSEUR-03-2012-FC-000040
    0 references