Q2982455 (Q2982455): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents., translated_summary)
Property / summary
 
The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents. (English)
Property / summary: The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents. (English) / rank
 
Normal rank
Property / summary: The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:51, 9 July 2021

Project Q2982455 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982455 in Portugal

    Statements

    0 references
    1,115,447.84 Euro
    0 references
    85.0 percent
    0 references
    13 July 2016
    0 references
    31 December 2019
    0 references
    MUNICÍPIO DE VALE DE CAMBRA
    0 references
    0 references

    40°50'59.32"N, 8°23'38.08"W
    0 references
    A solução corresponde à instalação de equipamento mecânico e eletromecânico na estação de tratamento de água de Roge e de um grupo elevatório num reservatório já existente, à construção de 3,9 km de condutas adutoras (elevatórias), 3 reservatórios (2 dos quais equipados com estação elevatória), 16,3 Km de rede de distribuição e 493 ramais domiciliários, prevendo-se que sirva 974 residentes. (Portuguese)
    0 references
    The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents. (English)
    9 July 2021
    0 references
    Vale de Cambra
    0 references

    Identifiers

    POSEUR-03-2012-FC-000646
    0 references