Q2982455 (Q2982455): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents. (English) | |||||||||||||||
Property / summary: The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:51, 9 July 2021
Project Q2982455 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2982455 in Portugal |
Statements
1,115,447.84 Euro
0 references
85.0 percent
0 references
13 July 2016
0 references
31 December 2019
0 references
MUNICÍPIO DE VALE DE CAMBRA
0 references
A solução corresponde à instalação de equipamento mecânico e eletromecânico na estação de tratamento de água de Roge e de um grupo elevatório num reservatório já existente, à construção de 3,9 km de condutas adutoras (elevatórias), 3 reservatórios (2 dos quais equipados com estação elevatória), 16,3 Km de rede de distribuição e 493 ramais domiciliários, prevendo-se que sirva 974 residentes. (Portuguese)
0 references
The solution corresponds to the installation of mechanical and electromechanical equipment in the Roge water treatment plant and of a lifting group in an existing reservoir, the construction of 3,9 km of adductor ducts (elevatory), 3 reservoirs (2 of which are equipped with lift station), 16.3 Km of distribution network and 493 branch offices, and is expected to serve 974 residents. (English)
9 July 2021
0 references
Vale de Cambra
0 references
Identifiers
POSEUR-03-2012-FC-000646
0 references