(Removed claim: summary (P836): Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system., r...) |
(Created claim: summary (P836): Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system., tra...) |
||||||||||||||
Property / summary | |||||||||||||||
Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system. (English) | |||||||||||||||
Property / summary: Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:51, 9 July 2021
Project Q2981990 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Valada sewage treatment plant |
Project Q2981990 in Portugal |
Statements
2,144,385.29 Euro
0 references
85.0 percent
0 references
29 January 2016
0 references
31 May 2020
0 references
CARTÁGUA - ÁGUAS DO CARTAXO, S.A.
0 references
Remodelação da ETAR de Valada e construção do sistema intercetor. O sistema intercetor compõe-se de 3 setores, cada um deles composto por uma estação elevatória e uma conduta elevatória. A ETAR existente permite atualmente o tratamento de águas residuais de 1,3% da população do município do Cartaxo. Graças a esta intervenção, 12,5% da população do Cartaxo passará a ter acesso a um sistema de saneamento adequado. (Portuguese)
0 references
Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system. (English)
9 July 2021
0 references
Cartaxo
0 references
Identifiers
POSEUR-03-2012-FC-000011
0 references