Q2981676 (Q2981676): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha. (English) | |||||||||||||||
Property / summary: The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:44, 9 July 2021
Project Q2981676 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2981676 in Portugal |
Statements
405,867.79 Euro
0 references
85.0 percent
0 references
8 May 2017
0 references
9 March 2020
0 references
MUNICÍPIO DE VILA NOVA DE GAIA
0 references
A presente candidatura consiste na execução das empreitadas Bacia de Retenção do Rio Horto, Bacia de Retenção do Rio Horto - Arquitetura Paisagista e Reforço da Capacidade de Drenagem da Linha de Água de Santa Marinha, na envolvente à Av. Ramos Pinto Santa Marinha. (Portuguese)
0 references
The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha. (English)
9 July 2021
0 references
Vila Nova de Gaia, União das freguesias de Santa Marinha e São Pedro da Afurada
0 references
Identifiers
POSEUR-02-1810-FC-000387
0 references