Q2981675 (Q2981675): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): Through 4 actions, measures to mitigate the effect of the floods of the river Águeda in the city were implemented, provided for in studies and planning tools to reduce the level of risk of people and assets., translated_summary)
Property / summary
 
Through 4 actions, measures to mitigate the effect of the floods of the river Águeda in the city were implemented, provided for in studies and planning tools to reduce the level of risk of people and assets. (English)
Property / summary: Through 4 actions, measures to mitigate the effect of the floods of the river Águeda in the city were implemented, provided for in studies and planning tools to reduce the level of risk of people and assets. (English) / rank
 
Normal rank
Property / summary: Through 4 actions, measures to mitigate the effect of the floods of the river Águeda in the city were implemented, provided for in studies and planning tools to reduce the level of risk of people and assets. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:44, 9 July 2021

Project Q2981675 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2981675 in Portugal

    Statements

    0 references
    996,174.41 Euro
    0 references
    85.0 percent
    0 references
    12 May 2014
    0 references
    31 December 2019
    0 references
    MUNICIPIO DE AGUEDA
    0 references
    0 references

    40°34'42.60"N, 8°26'37.68"W
    0 references
    Através de 4 ações, foram implementadas medidas de mitigação do efeito das cheias do rio Águeda na cidade, previstas em estudos e instrumentos de planeamento, visando reduzir o nível de risco de pessoas e bens. (Portuguese)
    0 references
    Through 4 actions, measures to mitigate the effect of the floods of the river Águeda in the city were implemented, provided for in studies and planning tools to reduce the level of risk of people and assets. (English)
    9 July 2021
    0 references
    Águeda
    0 references

    Identifiers

    POSEUR-02-1810-FC-000386
    0 references