Expansion and Remodeling of the Headquarters Building (Q2981650): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project to expand and remodel the barracks will be an intervention that will contribute to the improvement of the rescue network in the continental territory and simultaneously provide better conditions for the preparation, instruction and operation of the elements that are part of the Fire Department. Through a change in the paradigm of growth, operationality, equality and capacity, great productivity and quality will be achieved., translat...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Expansion and Remodeling of the Headquarters Building

Revision as of 01:43, 9 July 2021

Project Q2981650 in Portugal
Language Label Description Also known as
English
Expansion and Remodeling of the Headquarters Building
Project Q2981650 in Portugal

    Statements

    0 references
    0 references
    520,934.88 Euro
    0 references
    85.0 percent
    0 references
    15 July 2018
    0 references
    31 October 2020
    0 references
    ASSOCIAÇÃO HUMANITÁRIA DE BOMBEIROS VOLUNTÁRIOS DE PORTIMÃO
    0 references
    0 references

    37°8'15.29"N, 8°32'12.62"W
    0 references
    O projecto de ampliação e remodelação do edifício quartel será uma intervenção que contribuirá para a melhoria da rede de socorro no território continental e simultaneamente proporcionará melhores condições para a preparação, instrução e operação dos elementos que integram o Corpo de Bombeiros. Através de uma alteração do paradigma de crescimento, operacionalidade, igualdade e capacidade atingir-se-á uma grande produtividade e qualidade. (Portuguese)
    0 references
    The project to expand and remodel the barracks will be an intervention that will contribute to the improvement of the rescue network in the continental territory and simultaneously provide better conditions for the preparation, instruction and operation of the elements that are part of the Fire Department. Through a change in the paradigm of growth, operationality, equality and capacity, great productivity and quality will be achieved. (English)
    9 July 2021
    0 references
    Portimão, Portimão
    0 references

    Identifiers

    POSEUR-02-1810-FC-000343
    0 references