Q2982839 (Q2982839): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The operation Closure of Wastewater Sanitation Systems Connection to the Lousã/Póvoa Water Treatment Plant, intends to execute 1905.00 ml of gravitic collectors, 85 connecting branches and install 1 community septic tank, with connection to the Lousã/Póvoa Sanitation Subsystem and final treatment in the treatment plant of Lousã/Póvoa, with discharge of the effluent in the water line located near the ETAR., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The operation Closure of Wastewater Sanitation Systems Connection to the Lousã/Póvoa Water Treatment Plant, intends to execute 1905.00 ml of gravitic collectors, 85 connecting branches and install 1 community septic tank, with connection to the Lousã/Póvoa Sanitation Subsystem and final treatment in the treatment plant of Lousã/Póvoa, with discharge of the effluent in the water line located near the ETAR. (English) | |||||||||||||||
Property / summary: The operation Closure of Wastewater Sanitation Systems Connection to the Lousã/Póvoa Water Treatment Plant, intends to execute 1905.00 ml of gravitic collectors, 85 connecting branches and install 1 community septic tank, with connection to the Lousã/Póvoa Sanitation Subsystem and final treatment in the treatment plant of Lousã/Póvoa, with discharge of the effluent in the water line located near the ETAR. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation Closure of Wastewater Sanitation Systems Connection to the Lousã/Póvoa Water Treatment Plant, intends to execute 1905.00 ml of gravitic collectors, 85 connecting branches and install 1 community septic tank, with connection to the Lousã/Póvoa Sanitation Subsystem and final treatment in the treatment plant of Lousã/Póvoa, with discharge of the effluent in the water line located near the ETAR. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:43, 9 July 2021
Project Q2982839 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2982839 in Portugal |
Statements
222,432.3 Euro
0 references
85.0 percent
0 references
6 January 2020
0 references
31 January 2021
0 references
APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
0 references
A operação Fecho de Sistemas de Saneamento de Águas Residuais Ligação à ETAR da Lousã/Póvoa, pretende executar 1905,00 ml de coletores gravíticos, 85 ramais de ligação e instalar 1 fossa séptica comunitária, com ligação ao Subsistema de Saneamento da Lousã/Póvoa e tratamento final na ETAR da Lousã/Póvoa, com descarga do efluente na linha de água localizada na proximidade da ETAR. (Portuguese)
0 references
The operation Closure of Wastewater Sanitation Systems Connection to the Lousã/Póvoa Water Treatment Plant, intends to execute 1905.00 ml of gravitic collectors, 85 connecting branches and install 1 community septic tank, with connection to the Lousã/Póvoa Sanitation Subsystem and final treatment in the treatment plant of Lousã/Póvoa, with discharge of the effluent in the water line located near the ETAR. (English)
9 July 2021
0 references
Lousã
0 references
Identifiers
POSEUR-03-2012-FC-001276
0 references