(‎Created claim: summary (P836): The operation consists of a consolidation of the slope of Santa Margarida, on the north side of the hill of Santarém. Consolidation will be achieved through regularisation of the gap, soil compaction, construction of support walls and planting of plant species that will have the function of protecting soils from erosion. The slopes of Ribeira de Santarém 3 and 4 will also be intervened., translated_summary)
Property / summary
 
The operation consists of a consolidation of the slope of Santa Margarida, on the north side of the hill of Santarém. Consolidation will be achieved through regularisation of the gap, soil compaction, construction of support walls and planting of plant species that will have the function of protecting soils from erosion. The slopes of Ribeira de Santarém 3 and 4 will also be intervened. (English)
Property / summary: The operation consists of a consolidation of the slope of Santa Margarida, on the north side of the hill of Santarém. Consolidation will be achieved through regularisation of the gap, soil compaction, construction of support walls and planting of plant species that will have the function of protecting soils from erosion. The slopes of Ribeira de Santarém 3 and 4 will also be intervened. (English) / rank
 
Normal rank
Property / summary: The operation consists of a consolidation of the slope of Santa Margarida, on the north side of the hill of Santarém. Consolidation will be achieved through regularisation of the gap, soil compaction, construction of support walls and planting of plant species that will have the function of protecting soils from erosion. The slopes of Ribeira de Santarém 3 and 4 will also be intervened. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:40, 9 July 2021

Project Q2981504 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2981504 in Portugal

    Statements

    0 references
    4,481,812.95 Euro
    0 references
    85.0 percent
    0 references
    1 November 2014
    0 references
    15 October 2021
    0 references
    MUNICÍPIO DE SANTARÉM
    0 references
    0 references

    39°14'10.90"N, 8°42'21.13"W
    0 references
    A operação consiste numa empreitada de consolidação da encosta de Santa Margarida, na vertente norte da colina de Santarém. A consolidação será obtida por via da regularização do desnível, da compactação dos solos, construção de muralhas de sustentação e plantação de espécies vegetais que terão como função proteger os solos da erosão. Serão, ainda, intervencionadas também as encostas da Ribeira de Santarém 3 e 4. (Portuguese)
    0 references
    The operation consists of a consolidation of the slope of Santa Margarida, on the north side of the hill of Santarém. Consolidation will be achieved through regularisation of the gap, soil compaction, construction of support walls and planting of plant species that will have the function of protecting soils from erosion. The slopes of Ribeira de Santarém 3 and 4 will also be intervened. (English)
    9 July 2021
    0 references
    Santarém, União das freguesias de Santarém (Marvila), Santa Iria da Ribeira de Santarém, Santarém (São Salvador) e Santarém (São Nicolau)
    0 references