Q2982276 (Q2982276): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): This operation aims to close down the SAR in the parish of Santa Cruz do Douro, in the municipality of Baião, with a view to optimising the use of installed capacity in the Subsystem of Residual Water of Santa Cruz do Douro and adhesion to the service, by providing the service to about 35 inhabitants, through the construction of 0.7 Km of AR network., translated_summary)
Property / summary
 
This operation aims to close down the SAR in the parish of Santa Cruz do Douro, in the municipality of Baião, with a view to optimising the use of installed capacity in the Subsystem of Residual Water of Santa Cruz do Douro and adhesion to the service, by providing the service to about 35 inhabitants, through the construction of 0.7 Km of AR network. (English)
Property / summary: This operation aims to close down the SAR in the parish of Santa Cruz do Douro, in the municipality of Baião, with a view to optimising the use of installed capacity in the Subsystem of Residual Water of Santa Cruz do Douro and adhesion to the service, by providing the service to about 35 inhabitants, through the construction of 0.7 Km of AR network. (English) / rank
 
Normal rank
Property / summary: This operation aims to close down the SAR in the parish of Santa Cruz do Douro, in the municipality of Baião, with a view to optimising the use of installed capacity in the Subsystem of Residual Water of Santa Cruz do Douro and adhesion to the service, by providing the service to about 35 inhabitants, through the construction of 0.7 Km of AR network. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:35, 9 July 2021

Project Q2982276 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982276 in Portugal

    Statements

    0 references
    47,177.24 Euro
    0 references
    85.0 percent
    0 references
    30 November 2017
    0 references
    26 October 2020
    0 references
    ÁGUAS DO NORTE, S.A.
    0 references
    0 references

    41°7'25.32"N, 7°59'59.75"W
    0 references
    Esta Operação visa a o fecho do SAR em “baixa” na freguesia de Santa Cruz do Douro, no Município de Baião, com vista à otimização da utilização da capacidade instalada no Subsistema de Águas Residuais de Santa Cruz do Douro e da adesão ao serviço, pela disponibilização do serviço a cerca de 35 habitantes, através da construção de 0,7 Km de rede AR. (Portuguese)
    0 references
    This operation aims to close down the SAR in the parish of Santa Cruz do Douro, in the municipality of Baião, with a view to optimising the use of installed capacity in the Subsystem of Residual Water of Santa Cruz do Douro and adhesion to the service, by providing the service to about 35 inhabitants, through the construction of 0.7 Km of AR network. (English)
    9 July 2021
    0 references
    Baião, União das freguesias de Santa Cruz do Douro e São Tomé de Covelas
    0 references

    Identifiers

    POSEUR-03-2012-FC-000384
    0 references