Q2982271 (Q2982271): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): This operation aims to close a sewage system in the municipality of Amarante, with a view to optimising the use of installed capacity in the Wastewater Subsystem of Ovelha and joining the service, by providing the service to about 2,695 inhabitants (1659 actual inhabitants), through the construction of two lifting stations of waste water and 4,88 Km of interceptor and 0.5 km of network, translated_summary)
Property / summary
 
This operation aims to close a sewage system in the municipality of Amarante, with a view to optimising the use of installed capacity in the Wastewater Subsystem of Ovelha and joining the service, by providing the service to about 2,695 inhabitants (1659 actual inhabitants), through the construction of two lifting stations of waste water and 4,88 Km of interceptor and 0.5 km of network (English)
Property / summary: This operation aims to close a sewage system in the municipality of Amarante, with a view to optimising the use of installed capacity in the Wastewater Subsystem of Ovelha and joining the service, by providing the service to about 2,695 inhabitants (1659 actual inhabitants), through the construction of two lifting stations of waste water and 4,88 Km of interceptor and 0.5 km of network (English) / rank
 
Normal rank
Property / summary: This operation aims to close a sewage system in the municipality of Amarante, with a view to optimising the use of installed capacity in the Wastewater Subsystem of Ovelha and joining the service, by providing the service to about 2,695 inhabitants (1659 actual inhabitants), through the construction of two lifting stations of waste water and 4,88 Km of interceptor and 0.5 km of network (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:35, 9 July 2021

Project Q2982271 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982271 in Portugal

    Statements

    0 references
    539,520.06 Euro
    0 references
    85.0 percent
    0 references
    27 May 2016
    0 references
    5 November 2020
    0 references
    ÁGUAS DO NORTE, S.A.
    0 references
    0 references

    41°16'11.75"N, 8°4'49.66"W
    0 references
    Esta Operação visa a o fecho de sistema de saneamento de águas residuais no Município de Amarante, com vista à otimização da utilização da capacidade instalada no Subsistema de Águas Residuais de Ovelha e da adesão ao serviço, pela disponibilização do serviço a cerca de 2.695 habitantes (1659 habitantes efetivos), através da construção de duas estações elevatórias de águas residuais e 4,88 Km de intercetor e 0,5 km de rede (Portuguese)
    0 references
    This operation aims to close a sewage system in the municipality of Amarante, with a view to optimising the use of installed capacity in the Wastewater Subsystem of Ovelha and joining the service, by providing the service to about 2,695 inhabitants (1659 actual inhabitants), through the construction of two lifting stations of waste water and 4,88 Km of interceptor and 0.5 km of network (English)
    9 July 2021
    0 references
    Amarante
    0 references

    Identifiers

    POSEUR-03-2012-FC-000378
    0 references