Energy Efficiency at Hospital de São Bernardo in Setúbal (Q2981194): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The Hospital de Setúbal proposes to reconvert its energy systems in order to obtain significant savings, focusing on energy consumption drivers, use of LED in all lighting, thermal solar panels, technical management system, addition of multipliers in pumps, insulation in pipes, new fancoils and UTAs, insulation of the front and production of electricity by photovoltaic panels., remove_old_english_translation) |
(Created claim: summary (P836): The Hospital de Setúbal proposes to reconvert its energy systems in order to obtain significant savings, focusing on energy consumption drivers, use of LED in all lighting, thermal solar panels, technical management system, addition of multipliers in pumps, insulation in pipes, new fancoils and UTAs, insulation of the front and production of electricity by photovoltaic panels., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The Hospital de Setúbal proposes to reconvert its energy systems in order to obtain significant savings, focusing on energy consumption drivers, use of LED in all lighting, thermal solar panels, technical management system, addition of multipliers in pumps, insulation in pipes, new fancoils and UTAs, insulation of the front and production of electricity by photovoltaic panels. (English) | |||||||||||||||
Property / summary: The Hospital de Setúbal proposes to reconvert its energy systems in order to obtain significant savings, focusing on energy consumption drivers, use of LED in all lighting, thermal solar panels, technical management system, addition of multipliers in pumps, insulation in pipes, new fancoils and UTAs, insulation of the front and production of electricity by photovoltaic panels. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The Hospital de Setúbal proposes to reconvert its energy systems in order to obtain significant savings, focusing on energy consumption drivers, use of LED in all lighting, thermal solar panels, technical management system, addition of multipliers in pumps, insulation in pipes, new fancoils and UTAs, insulation of the front and production of electricity by photovoltaic panels. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:32, 9 July 2021
Project Q2981194 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy Efficiency at Hospital de São Bernardo in Setúbal |
Project Q2981194 in Portugal |
Statements
5,000,000.0 Euro
0 references
85.0 percent
0 references
1 January 2017
0 references
31 August 2022
0 references
CENTRO HOSPITALAR DE SETÚBAL, EPE
0 references
O Hospital de Setúbal propõe-se reconverter os seus sistemas energéticos, de forma a obter poupanças significativas, incidindo sobre os drivers de consumo energético, utilização de LED em toda a iluminação, painéis solares térmicos, sistema de gestão técnica, adição de variadores nas bombas, isolamento em tubagens, novos fancoils e UTAs, isolamento de fachada e produção de eletricidade por painéis fotovoltaicos. (Portuguese)
0 references
The Hospital de Setúbal proposes to reconvert its energy systems in order to obtain significant savings, focusing on energy consumption drivers, use of LED in all lighting, thermal solar panels, technical management system, addition of multipliers in pumps, insulation in pipes, new fancoils and UTAs, insulation of the front and production of electricity by photovoltaic panels. (English)
9 July 2021
0 references
Setúbal, Setúbal (São Sebastião)
0 references
Identifiers
POSEUR-01-1203-FC-000080
0 references