Energy efficiency in the building of the Centro de Informática da Universidade da Beira Interior (Q2981170): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): It is intended to implement insulation of the outer cover, replace the burner, install the heat pump, intervene in lighting, install a monitoring system for electricity and gas consumption and a photovoltaic system for the production of electricity for self-consumption. The expected results are the reduction and monitoring of energy costs, primary energy and the reduction of greenhouse gas emissions., remove_old_english_translation)
Property / summary
It is intended to implement insulation of the outer cover, replace the burner, install the heat pump, intervene in lighting, install a monitoring system for electricity and gas consumption and a photovoltaic system for the production of electricity for self-consumption. The expected results are the reduction and monitoring of energy costs, primary energy and the reduction of greenhouse gas emissions. (English)
 
Property / summary: It is intended to implement insulation of the outer cover, replace the burner, install the heat pump, intervene in lighting, install a monitoring system for electricity and gas consumption and a photovoltaic system for the production of electricity for self-consumption. The expected results are the reduction and monitoring of energy costs, primary energy and the reduction of greenhouse gas emissions. (English) / rank
Normal rank
 
Property / summary: It is intended to implement insulation of the outer cover, replace the burner, install the heat pump, intervene in lighting, install a monitoring system for electricity and gas consumption and a photovoltaic system for the production of electricity for self-consumption. The expected results are the reduction and monitoring of energy costs, primary energy and the reduction of greenhouse gas emissions. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 01:31, 9 July 2021

Project Q2981170 in Portugal
Language Label Description Also known as
English
Energy efficiency in the building of the Centro de Informática da Universidade da Beira Interior
Project Q2981170 in Portugal

    Statements

    0 references
    65,753.68 Euro
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 May 2020
    0 references
    UNIVERSIDADE DA BEIRA INTERIOR
    0 references
    0 references

    40°16'46.88"N, 7°30'17.53"W
    0 references
    Pretendem-se implementar o isolamento da cobertura exterior, substituir o queimador, instalar a bomba de calor, intervencionar a iluminação, instalar um sistema de monitorização de consumos de eletricidade e gás e um sistema fotovoltaico de produção de energia elétrica para autoconsumo. Os resultados esperados são a redução e monitorização dos custos energéticos, da energia primária e a redução de emissão de gases com efeito de estufa. (Portuguese)
    0 references
    Covilhã, União das freguesias de Covilhã e Canhoso
    0 references

    Identifiers

    POSEUR-01-1203-FC-000047
    0 references