Energy Efficiency in Building D of the College of Lions (Leoes-D) (Q2981176): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The following improvement measures were considered: Thermal insulation placement in the roofs, gutters and some walls and replacement of existing lamps by LED., translated_summary) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Energy Efficiency in Building D of the College of Lions (Leoes-D) |
Revision as of 01:14, 9 July 2021
Project Q2981176 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy Efficiency in Building D of the College of Lions (Leoes-D) |
Project Q2981176 in Portugal |
Statements
180,133.12 Euro
0 references
85.0 percent
0 references
1 September 2017
0 references
31 May 2021
0 references
UNIVERSIDADE DE ÉVORA
0 references
Foram consideradas as seguintes medidas de melhoria: colocação de isolamento térmico nas coberturas, caleiras e algumas paredes e substituição das lâmpadas existentes por LED. (Portuguese)
0 references
The following improvement measures were considered: Thermal insulation placement in the roofs, gutters and some walls and replacement of existing lamps by LED. (English)
9 July 2021
0 references
Évora, União das freguesias de Bacelo e Senhora da Saúde
0 references
Identifiers
POSEUR-01-1203-FC-000053
0 references